My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - 2008 Riparian Stabilization Project - Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - 2008 Riparian Stabilization Project - Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 2:43:56 PM
Creation date
9/16/2008 3:56:18 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Rio Grande
Applicant
Colorado Rio Grande Restoration Foundation
Description
2008 Rio Grande Stabilization Project
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150452
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to demonstrate the relative stability of the stream bank and to evaluate the degree of <br />improvement in the riparian condition. <br />• Cost to Complete Objective # 3: $12,000.00 <br />Scope of Work -Objective # 4 Education /Outreach <br />• Conduct public information /outreach /education program on Project activities to <br />raise awareness of the RGHRP, and encourage other landowners to consider <br />participation in this or future projects. <br />• Methods: Develop visual aids and written materials of Project showing the specific <br />sites and proposed work. Make presentations at the SLV Wetlands Area Focus <br />Committee; Rio Grande Interbasin Roundtable; quarterly Board Meetings of the Rio <br />Grande Water Conservancy District; Board Meetings of the San Luis Valley Water <br />Conservancy District and to specific public meetings. In addition, give interviews and <br />status reports on local radio stations. Conduct tours to demonstrate the applied <br />techniques. This will be done by RGHRP staff and volunteers. <br />• Deliverables/products; A public that is better informed and more aware of river related <br />issues, especially regarding the work of the RGHRP, the role of the Foundation, and <br />the restoration program in general, including site-specific methodologies used to <br />achieve stabilization of the riparian areas. Outreach and education efforts will impress <br />upon the public the importance of reducing sediment loading in the river and will raise <br />awareness and gain support and participation in this and future projects of the <br />RGHRP. <br />• Cost to Complete Objective # 4: $3,000.00 <br />Scope of Work -Objective # 5 Administration of the Project <br />• Methods: <br />o Execute CWCB Purchase Order or Contract. Administer P.O. or Contract with <br />CWCB. Maintain financial records of all payments and reimbursements. <br />o Execute and administer State CDPH&E Contact for EPA 319 Funds, and <br />administer, including Semi-Annual Reports, Annual Reports, and a Final Report. <br />Maintain financial records of all payments and reimbursements. <br />o Coordinate with Project's landowners, contract with participating landowners. <br />Administer contracts. <br />o Select third party engineering support and construction contractor(s), contract <br />negotiation and administration. <br />o Execute contracts for services. Monitor work to ensure project design and cost <br />estimates are timely, complete, and accurate. Monitor on-site activities for <br />completeness and correctness. Maintain financial records of all payments. <br />o Manage the necessary Monitoring Program <br />• Deliverables/products: All appropriate contracts, financial records, external and <br />internal reports. Project completion within planned period and anticipated costs. <br />• Cost to Complete Objective #5: $26,000.00
The URL can be used to link to this page
Your browser does not support the video tag.