My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Battlement Reservoir #3_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Battlement Reservoir #3_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2012 10:16:03 AM
Creation date
9/16/2008 2:49:09 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
Trout Unlimited Inc, Grand Valley Anglers
Description
Battlement Reservoir #3 Dam Reconstruction
Account Source
Basin
Board Meeting Date
9/1/2008
Contract/PO #
11000000126
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account -Grant Application Form <br />Form Revised May 2007 <br />acres to 16 for nonconsumptive use in Battlement Reservoir #3. The development of a native CRC trout <br />fishery and brood stock refugia for a native State Species of Special Concern will increase the recreational <br />opportunity and use by anglers and other outdoor enthusiasts in a beautiful location in northwestern <br />Colorado. The increased storage of water will help recharge the aquifers that the Towns of Parachute and <br />Battlement Mesa depend on for their water supply, which originates from springs below the White River <br />National Forest. <br />5. Please summarize the proposed scope of work. Please refer to Part 2 of the Criteria and Guidance document <br />for detailed requirements. On the following page there is an example format for the Scope of Work. You can <br />use the example format or your own format, provided that comparable information is included. <br />The scope of work should outline by task how the water activity will be accomplished. It is important that the <br />scope of work detail the specific steps, activities/procedures that will be followed to accomplish the water <br />activity and the specific products/deliverables that will be accomplished. The scope of work should include <br />but not be limited to: task description, key personnel, budget, schedule and deliverables and the final <br />report/project documentation upon completion of the water activity. <br />Proposed Scope of Work <br />I. Task 1 <br />• Description of task: <br />Removal of existing outlet structure at Battlement Reservoir #3 <br />• Method or procedure that will be used or followed to accomplish the task and identify who will undertake <br />the task: <br />Heavy equipment removal of approximately 1000 square feet of material by the BOR construction <br />crew (see Engineering Figures) <br />• Description of the major deliverableslproducts that will be produced upon successful completion of the <br />task: <br />Preparation for Task 2: construction of a permanent, hardened spillway <br />Task 2 <br />• Description of task: <br />Construction of permanent, hardened spillway at Battlement Reservoir #3 <br />• Method or procedure that will be used or followed to accomplish the task and identify who will undertake <br />the task: <br />Heavy equipment construction of approximately 325 square feet of material by the BOR design and <br />construction crew (see Engineering Figures) <br />• Description of the major deliverables/products that will be produced upon successful completion of the <br />task: <br />7
The URL can be used to link to this page
Your browser does not support the video tag.