My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Fowler Water Resource Development_Application 1
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Fowler Water Resource Development_Application 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2009 2:23:24 PM
Creation date
9/16/2008 2:02:23 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
Town of Fowler
Description
Water Resource Development for the Town of Fowler, CO
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br />What is the purpose of this grant application? <br />2. Describe how the water activity meets these Threshold Criteria. <br />1. The water activity meets the eligibility requirements outlined in Part 2 of the Criteria and Guidelines. <br />The project is eligible as a Structural Water Project. The To'kvn of Fowler is eligible as a Public <br />(Government) Municipality. <br />2. The water activity is consistent with Section 37-75-102 Colorado Revised Statutes. The <br />requirements/language from the statute is provided in Part 3 of the Criteria and Guidelines. <br />Fowler is currently- operating under CWPDA's Arkansas River Replacement Plan to replace its out of <br />priority depletions. The Town has seven more years under this plan before it must develop its own <br />Augmentation Plan and have it adjudicated in the Water Court. <br />There are two principal sources for the Town's replacement water, The Oxford Farmers Ditch Shares <br />and Frying Pan Arkansas Project Water. The Town controls 8.6 shares of the Oxford and has 481.29 <br />acre feet of Project Water stored in Pueblo Reservoir. To date, Fowler has never had a problem <br />meeting its replacement obligations of about 475 ac.-ft./year. <br />3. The water activity underwent an evaluation and approval process and was approved by the Basin <br />Roundtable (BRT) and the application includes a description of the results of the BRTs evaluation <br />and approval of the activity. At a minimum, the description must include the level of agreement <br />reached by the roundtable, including any minority opinion(s) if there was not general agreement for
The URL can be used to link to this page
Your browser does not support the video tag.