Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 3 <br />OPINION OF COST <br />RIST-BENSON RESERVOIR <br />Alternative No.2 - Sheet Pile Cut Off Wall <br /> <br />IbM UNIT <br />DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br />1. Mobilization, Insurance, Bonds 1.00 L.S. $ 15,000.00 $ 15,000 <br />2, Stripping 2,00 Acre $ 2,000.00 $ 4,000 <br />3. Sheet Pile Wall 8000.00 S.F. $ 25.00 $ 200,000 <br />4. Riprap 1200.00 Tons $ 29.00 $ 35,000 <br />5. Riprap Bedding 400.00 Tons $ 25.00 $ 10,000 <br />6. Roadbase 200.00 Tons $ 20.00 $ 4,000 <br />7. Piezometers 8.00 Each $ 1,800.00 $ 14,500 <br />8. Movement Monuments 10,00 Each $ 165.00 $ 2,000 <br />9. Station Markers 15.00 Each $ 125.00 $ 2,000 <br />10. Seeding 2.00 Acres $ 1,000.00 $ 2,000 <br />11. Toe Drain 1.00 L.S. $ 42,500.00 $ 42,500 <br />12, Erosion Control 1.00 L.S. $ 2,000.00 $ 2,000 <br />13. Surveying 1.00 L.S. $ 6,600.00 $ 7,000 <br /> <br />* Amounts shown are rounded to the nearest $500 <br /> <br />TOTAL CONSTRUCTION COST <br />ENGINEERING <br />CONTINGENCY @ 20% <br />FEASffiILITY STUDY <br />TOTAL COST <br /> <br />$ <br />$ <br />$ <br />$ <br />$ <br /> <br />340,000 <br />68,000 <br />68,000 <br />18,858 <br />494,858 <br />