My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11759
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOOD11759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:24:09 AM
Creation date
7/29/2008 10:54:55 AM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Stream Name
Bosley Wash
Basin
Colorado Mainstem
Title
Bosley Wash Drainage Master Plan - Phase 2: Alternative Drainage Facility Evaluation - Draft
Date
11/1/2002
Prepared For
Bosley Wash Watershed, CWCB
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Bosley Wash Drainage Master Plan <br />r' ,_~ ,,- -: ,.~- ^ . . ,-'.', u'- , - <br />r~ ):-,4d;.j.;."i0>i-',-'_ ~~" <br /> <br />Phase 2: Alternative Drainage Facility Evaluation <br /> <br /> <br />1.3 Phase 2 Scope <br /> <br />Phase 2 of the Bosley Wash Drainage Master Plan includes the evaluation of alternatives <br />and the recommendation of a preferred alternative plan. Specific elements of the effort <br />include the development of alternatives that mitigate the flood problems identified within <br />the Watershed. An evaluation will be conducted that determines the effectiveness of <br />identified alternatives in reducing the flood hazard to properties within the basin. <br />Conceptual level costs and benefits will be identified. The results of these evaluations <br />will be used to recommend an alternative that repres.ents the consultants preferred plan. <br />This plan is presented in this Phase 2 Report. <br /> <br />1.4 Phase 3 Summary <br /> <br />Phase 3 of the Bosley Wash Drainage Master Plan will include the preliminary design of <br />the facilities selected by the County, the GJDD, CWCB, and the citizens of the Bosley <br />Wash Watershed. A report will be prepared that summarizes the recommendations and <br />presents preliminary design drawings of the selected plan. The Phase 3 Report is not <br />intended to present the design with a level of detail sufficient to enable construction of <br />the facilities. <br /> <br />2.0 PROBLEM IDENTIFICATION <br /> <br />The Phase 1 Floodplain Delineation included the development of a thorough <br />understanding of the nature and cause of many of the flooding problems within the <br />Watershed. This understanding helped us identify problem areas within the Watershed <br />and better understand the cause of those problems. The following sections describe the <br />location and character of the problems within the Watershed. <br /> <br />2.1 Inadequate Channel Capacity <br /> <br />Limited channel capacity represents one of the major problems within the Watershed. <br />There are several locations where the amount of water reaching a particular reach of <br />channel cannot be adequately conveyed by the channel in its current configuration. In <br />some cases, this limited capacity causes flooding in the immediate vicinity of the <br /> <br />Gi:1~2~;;;J:1~:L;:;::-;;~:-~-=~:=~~:::'S~E~~_~-~~-_'~ "~,~~_:;"_::_'~"; ~];:. .:-:~.-:~~~~,--:,.:.^_.~_, '~.~,,:~.~' ~__~~ ~~,"_'~. _; ~_ ,:~_ <br /> <br />~.~l:;"---";'''' <br />i;~,~' <br />~:J.;~~~~~X..:.~~:'~ <br /> <br /> <br />Page 2 <br /> <br />h-'\ <br />~~ <br /> <br />@'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.