Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />,iJo,sley Wash DTflinase Master flan <br />T^ <br />" "",' <br /> <br /> <br /> <br />Phase2: Alternative Drainage Facility Evaluation <br /> <br />importantly, the area represents an opportunity to achieve major reductions in <br />downstream flood discharges. In addition, the relative lack of development and the steep <br />terrain make the cost of land and the potential future impacts of construction .low. <br /> <br />Large vond ovtion: <br />The largest of the identified pond options provides 75.5 AF of storage and reduces <br />the downstream discharge into Bosley Wash to 50 cfs. This discharge was small <br />enough to reduce the potential overtopping of the downstream channel sections <br />and flooding above the Government Highline Canal. The cost of the facility, <br />including property acquisition costs, is estimated to be $1.15 million. <br /> <br />Intermediate pund optiut7. A. . <br />An intermediate pond option has been identified which provides 63.5 AF of <br /> <br />storage and reduces the downstream discharge to 100 cfs. The cost of the facility, <br /> <br />including property acquisition costs, is estimated to be $980,000. <br /> <br />Intermediate vond option B: <br />Another intermediate pond option consisting of 57.5 AF of storage and reducing <br /> <br />the downstream discharge to 150 cfs was developed. The cost of the facility, <br /> <br />including property acquisition costs, is estimated to be $900,000. <br /> <br />Smallvond option: <br />A final option for this location was evaluated. This option, the smallest of those <br />considered, provided a storage volume of 48.5 AF and reduced the downstream <br />discharge to 300 cfs. The cost of the facility, including property acquisition costs, <br />is estimated to be $775,000. <br /> <br />3.2 Improved Channel Capacity <br /> <br />Improving channel capacity represents another alternative for reducing flood damages. In <br />most cases, the enlargement of channels could be accomplished by excavating a small <br />amount of material from the channel bottom and banks and using that material to build up <br />the top of the channel banks. This prevents overtopping and the spilling of flood waters <br />onto adjacent properties or onto properties further downstream. For purposes of design, <br /> <br />: ,:,:.f,~~~::::Jfii.l{V!+ ~ <br />,/t.. A' <br />y~~ ~~ <br />-{.:bj~::d;i~<> ' <br /> <br /> <br />Page 11 <br /> <br />/---'...., <br />~ <br /> <br />@'1 <br />