Laserfiche WebLink
<br />-2- <br /> <br />The Committee reviewed the Board's memorandum and attachments dated July 12, 2004. This <br />assessment included review and comments of the CWCB' s existing Floodplain Rules and Regulations <br />with an effective date ofJanuary 11, 1988. <br /> <br />The two operating objectives for the Committee are: <br />1. How to reasonably delineate the 100-year floodplain and place the 100-year flood limits on <br />floodplain maps using the CWCB criteria manual and the operating principles. <br />2. To what extent of involvement should floodplain administrative and management issues be <br />addressed in the new rules. <br /> <br />The Committee has conducted four work sessions reviewing and discussing the Floodplain <br />Rules and drafting language for the proposed revisions to these Floodplain Rules. Staff presents a <br />revised outline to its July 12, 2004 proposal- Attachment A. <br /> <br />Rule Title Rule Content NewlRevisedlNC <br />1 Rules and Regulation for the Designation Long and Short Title Revised <br /> and Approval of Regulatory Floodplains <br />2 Authority State Statutes NC <br />3 Purpose and Scope Purpose of these rules IS to provide Revised <br /> reasonably uniform standards for the <br /> designation and approval of the regulatory <br /> floodplains. <br /> Scope will address floodplain engineering, <br /> floodplain zoning, and local drainage <br /> reports, dam failure inundation zones. <br />4 DefInitions Terms applicable to the rules and Revised <br /> regulations <br />5 State Regulatory Floodplain The regulatory floodplain is the lOO-year New wording with the <br /> floodplain same intent <br />6 Standards for Delineation of the Regulatory A. Base mapping New/Revised <br /> Floodplain Information B. Vertical and horizontal control - <br /> 1988 vs. 1929 datum <br /> C. Map accuracy <br /> D. Hydrologic determinations <br /> E. Hydraulic determinations <br /> F. Floodplain delineations <br /> G. Unique floodplain delineations <br /> H. Published Reports and maps and <br /> digital formats <br /> I. Contractor qualifIcations <br />7 Floodwavs Use language in the Operating Principle New <br />8 Criteria for determining the effects of dams A. Flood Control Dams NC <br /> on the regulatory floodplain B. Non-Flood Dams New <br /> C. Detention Dams New <br />9 Criteria for determining the effects of levees Use the FEMA levee criteria in Section Revised <br /> on the regulatory floodplain 65.10 of the Code of Federal Regulations <br />10 Criteria for storm water detention Use language in the Operating Principle New <br /> consideration on the regulatory floodplain <br /> <br />Revised Attachment A <br />Outline for the Revision of CWCB Floodplain Rules and Regulations <br />November 2004 <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />