Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 5 <br />OPINION OF COST <br />LARIMER & WELD IRRIGATION - LAKE LEE DAM <br />Remove & Replace Structure <br /> <br />Item No. Description Qty Units Unit Price Amount <br />1 Mobilization, Insurance, Bonds 1 L.S. $ 11,762 $ 11,762 <br />2 Dewatering 1 L.S. $ 15,000 $ 15,000 <br />3 Concrete Structures <br /> Floor Slab 225 C.Y. $ 450 $ 101,250 <br /> Walls 125 C.Y. $ 500 $ 62,500 <br /> Fillets 35 c.Y. $ 350 $ 12,250 <br /> Energy Blocks 5 C.Y. $ 350 $ 1,750 <br />4 Bridge Deck <br /> Concrete Deck 30 C.Y. $ 525 $ 15,750 <br /> Handrail 1 L.S. $ 10,000 $ 10,000 <br />5 Gates - 17' x 6' <br /> Radial Gates & Manual Operators 2 L.S. $ 46,000 $ 92,000 <br />6 Demolition <br /> Labor/Supervision 40 Hours $ 50 $ 2,000 <br /> Backhoe 40 Hours $ 135 $ 5,400 <br /> Pavement Breaker 32 Hours $ 150 $ 4,800 <br /> Loader 32 Hours $ 95 $ 3,040 <br /> Dump Truck 32 Hours $ 95 $ 3,040 <br />7 Excavation & BackfIll <br /> Excavation 750 C.Y. $ 8 $ 6,000 <br /> Backfill 1500 C.Y. $ 4 $ 6,000 <br /> Imported Backfill Material 750 C.Y. $ 16 $ 12,000 <br /> Sub grade Stabilization 250 C.Y. $ 25 $ 6,250 <br />8 Cofferdam <br /> Imported Material 750 C.Y. $ 16 $ 12,000 <br /> Placement & Removal 750 C.Y. $ 10 $ 7,500 <br />9 Riprap 300 Tons $ 22 $ 6,600 <br /> Riprap Bedding 75 Tons $ 18 $ 1,350 <br />10 Seeding 1 Acres $ 2,000 $ 2,000 <br />11 Road Base 200 Tons $ 18 $ 3,600 <br />TOTAL $ 403,842 <br />