Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 4 <br />OPINION OF COST <br />LARIMER & WELD IRRIGATION - FINLEY CHECK <br />Replace Structure <br /> <br />Item No. Description Qty Units Unit Price Amount <br />1 Mobilization, Insurance, Bonds 1 L.S. $ 6,072 $ 6,072 <br />2 Dewatering 5 Days $ 300.00 $ 1,500 <br />3 Concrete Structures <br /> Floor Slab 65 C.Y. $ 450.00 $ 29,250 <br /> Walls 60 C.Y. $ 500.00 $ 30,000 <br /> Fillets 10 C.Y. $ 350.00 $ 3,500 <br />4 Gates <br /> Obermeyer Gates & Manual Operators -25' x 7' 1 L.S. $ 52,500.00 $ 52,500 <br />5 Earthwork <br /> Excavation 200 C.Y. $ 6.00 $ 1,200 <br /> Imported Backfill 550 C.Y. $ 28.00 $ 15,400 <br />6 Cofferdam <br /> Imported Material 200 C.Y. $ 16.00 $ 3,200 <br /> Placement & Removal 200 C.Y. $ 10.00 $ 2,000 <br />7 Riprap 500 TONS $ 22.00 $ 11,000 <br /> Riprap Bedding 125 TONS $ 18.00 $ 2,250 <br />TOTAL $ 157,872 <br />