Scope of Work <br />Town of Walden Water Supply Improvement Project <br />4. Alternative 4 -Change the use of the Town's shares in the Walden Reservoir to <br />municipal and augmentation use including the augmentation of the Town's <br />Hansen Park well or other wells and diversions structures. <br />Tasks <br />This work plan is divided into four major tasks with multiple sub-tasks under each, <br />addressing each of the objectives. The following is a list and description of tasks to be <br />completed under this Scope of Work. <br />Task 1: Construct a New Collection Gallery to Divert the Senior Hi Ho Ditch <br />1.1-Construct Test Wells or Pits to Determine Alluvial Characteristics <br />A water well contractor will be hired to construct test wells or test pits to determine <br />the saturated thickness and transmissivity of the alluvium adjacent to the Michigan <br />River in order to determine if a collection gallery is feasible. The Engineer will <br />provide direction and supervision of the contractor. <br />1.2 -Design the Collection Gallery Based on Information from the Test Welts <br />The Engineer will design the collection gallery to divert up to 1.0 cubic feet per second <br />(cf s) of the Hi Ho Ditch water right. The collection gallery will deliver water into a <br />sump where water can be pumped to the Town's water treatment plant. <br />1.3 - Acquire a 404 Permit from the U.S. Army Corps of Engineers (USAGE,) if needed <br />A Section 404 wetland permit may be required in order to allow construction of the <br />collection gallery in the area adjacent to the Michigan River. The Engineer will assist <br />in obtaining the permit for the Town. <br />1.4 - Obtain a DWR Well Permit for the Collection Gallery <br />The Engineer will assist in obtaining a well permit f or the Town to allow construction <br />of the well. <br />1.5 - Obtain an Alternate Point of Diversion for the Hi Ho Ditch to the Collection <br />Gallery <br />The Town's water attorney will file an application with the Division 6 Water Court to <br />allow the collection gallery to divert the Hi Ho Ditch as an alternate point of diversion <br />to the existing surf ace diversion. The Engineer will assist the water attorney with the <br />engineering analysis and other inf ormation needed to f ile the application and provide <br />an expert report and testimony if needed at trial. It is expected that the application <br />will not be contested and that the V1Tater Court will grant the decree within 6 months. <br />1.6 -Construct the Collection Gallery after the Alternate Point of Diversion is <br />Decreed <br />The Engineer will provide construction supervision and oversight of a water well <br />contractor hired to construct the collection gallery and pumping system and connect it <br />to the Town's water supply. <br />2 <br />