My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Platte - Walden Water Supply Improvement Project_Water Activity Summary
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
North Platte - Walden Water Supply Improvement Project_Water Activity Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:27:27 AM
Creation date
7/18/2008 3:49:49 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
North Platte
Applicant
Town of Walden
Description
Town of Walden Water Supply Improvement Project
Account Source
Basin
Board Meeting Date
7/23/2008
Contract/PO #
150431
WSRA - Doc Type
Water Activity Summary Sheet - CWCB Evaluation/Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3: Rehabilitate the Existing Surface Diversion Structure in the <br />Michigan River <br />3.1 - Obtain a 404 Permit if needed <br />3.2 -Develop Plans and Specifications for the Reconstruction of the Diversion <br />Stn~cture <br />3.3 - Constn~ct a Ne~~- Diversion Structure from the Michigan River <br />Task 4: Change the Use of the Town's Shares in Walden Reservoir <br />4.1 -Obtain the Approval of the Walden Reservoir Company to Change the Use of <br />the To~~m's Shares <br />42 -Evaluate the Historical Consumptive Use of the Sim Shares of Walden Reseivoi<- <br />Owned h~ the To~~°n <br />4.3 - Obtain a Water Court Decree Changi<ig the Use of the Walden Reservoir Shares <br />4.4 - Obtain a Water Court Decree Approving a Plan for Augmentation Using the <br />Walden Reservoir Shares <br />
The URL can be used to link to this page
Your browser does not support the video tag.