My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Lake San Cristobal Outlet Mod Project Phase II_Water Activity Summary
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Gunnison - Lake San Cristobal Outlet Mod Project Phase II_Water Activity Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2012 11:33:37 AM
Creation date
7/18/2008 2:22:01 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Upper Gunnison River Water Conservancy District
Description
Lake San Cristobal Outlet Modification Project - Phase II
Account Source
Basin
Board Meeting Date
7/23/2008
Contract/PO #
09000000041
WSRA - Doc Type
Water Activity Summary Sheet - CWCB Evaluation/Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Threshold and Evaluation Criteria <br />The application articulates how the project meets all four Threshold Criteria. <br />Discussion: <br />As identified in the major findings in SWSI, supplies are not necessarily where demands are located. If <br />implemented, the location of this storage has the potential to address many important needs in the Lake Fork <br />Gunnison basin. Lake San Cristobal is located relatively high in the basin, an important attribute when <br />considering an augmentation source. Development in the Lake City area has placed significant pressures on <br />the water supplies in the Lake Fork Gumlison River basin which is likely to continue in the foreseeable <br />future. An upstream augmentation source such as San Cristobel Lake would augment out of priority <br />depletions within the Lake Fork basin rather that utilizing downstream sources such as Blue Mesa Reservoir. <br />Issues/Additional Needs: <br />Please include a more detailed scope of work in which the major tasks and subtasks corresponds with the <br />budget that was subnutted (e.g. tasks D through G). <br />Please include a schedule that corresponds with the major tasks. <br />Staff Recommendation: <br />Staff recommends approval of up to $75,265 from the Gumlison Basin Account to help frind the Lake San <br />Cristobal Outlet Modification Project contingent on resolution of the item in the issues/additional needs <br />section. <br />All products, data and information developed as a result of this grant must be provided to CWCB in hard <br />copy and electronic format as part of the project documentation. This information will in turn be made <br />widely available to Basin Roundtables and the general public and will help promote the development of a <br />common technical platform. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.