My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP01481 (2)
CWCB
>
Instream Flow Appropriations
>
DayForward
>
1-1000
>
ISFAPP01481 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:06:06 AM
Creation date
7/18/2008 11:26:51 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
94CW0260
Stream Name
Bear Creek
Watershed
Bear Creek
Water Division
1
Water District
9
County
Jefferson
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />. <br /> <br />d. Hiwan Reservoir No.5: The high water line of the left abutment of the dam is located at a point <br />whence the SE comer of Section 20, Township 4 South, Range 71 West, 6th P.M. bears South <br />76002'East, 2288 feet. <br /> <br />e. Hiwan Reservoir No.6: The high water line of the left abutment of the dam is located at a point <br />whence the NE comer of Section 29, Township 4 South, Range 71 West, 61h P.M. bears North <br />85009'East, 1783 feet. <br /> <br />f. Hiwan Reservoir No.7: The high water line of the left abutment of the dan1 is located at a point <br />whence the NE comer of Section 29, Township 4 'South, Range 71 West, 6th P.M. bears North <br />50050'East, 1244 feet. <br /> <br />g. Hiwan Reservoir No. 8 Fifth Enlargement: The reservoir outlet is located at a point whence the <br />NW comer of Section 28, Township 4 South, Range 71 West, 6th P.M. bears North 42030'West, <br />4480 feet. <br /> <br />h. Hiwan Reservoir No.9: The reservoir outlet is located at a point whence the NW comer of <br />Section 28, Township 4 South, Range 71 West, 6th P.M. bears North 24030'Westl 1250 feet. <br /> <br />i. Hiwan Reservoir No. 10: The reservoir outlet is located at a point whence the NW comer of <br />Section 28, Township 4 South, Range 71 West, 6th P.M. bears North 32045'West, 1930 feet. <br /> <br />The parties also acknowledge that in order for Genesee to store water in any of these <br />reservoirs, Genesee must comport with the conditions included in the decrees for Case Nos. W- <br />7049, W-7050, and 94CW150, including by examp~e, but not limited to the following condition: <br />the annual volume of water taken under Priority Nos. 11 and IS shall be limittjd to 125 acre-feet, <br />and the period of diversion of Genesee's share of Priorities Nos. 11 and IS shall be limited to the <br />period May 15 through October 31 of each year. <br /> <br />3. The CWCB and Genesee agree that Genesee may store all or a portion of the 125 <br />acre-feet in any of the conditional reservoirs decreed in Case Nos. W-227, W1515, W1516, W1557, <br />90CW194 and 91CW112. However, in order to sto*e the 125 acre-feet in any of these conditional <br />reservoirs, Genesee must comply with the conditions I of the corresponding decrees. <br /> <br />4. Genesee may store all or a portion of'the 125 acre-feet in an on-site reservoir which <br />could be filled by diversions from the Genesee Pipeli'ne. <br /> <br />5. The CWCB and Genesee agree that if upstream reservoirs are ultimately not <br />feasible, Genesee may store the 125 acre feet at OJ1.e or more of the downstream reservoirs (e.g. <br />Soda Lakes, Bear Creek, Cooley Reservoirs). Stora~e in downstream reservoirs, however, may not <br />adversely affect the instream flow because the 12$ acre-foot diversion is currently decreed for <br />diversion at Genesee's Pipeline diversion structure.! Moving the water to a downstream reservoir <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.