My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP01477 (2)
CWCB
>
Instream Flow Appropriations
>
DayForward
>
1-1000
>
ISFAPP01477 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:06:06 AM
Creation date
7/18/2008 10:46:20 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
94CW0259
Stream Name
Bear Creek
Watershed
South Platte
Water Division
1
County
Jefferson
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />',,> <br /> <br />. <br /> <br />. <br /> <br />d. Hiwan Reservoir No.5: The high water line of the left abutment of the d~ is located at a point <br />whence the SE comer of Section 20~ Township 4 South~ Range 71 West~ 61~h P.M. bears South <br />76002~East~ 2288 feet. <br /> <br />, <br /> <br />e. Hiwan Reservoir No.6: The high water line of the left abutment of the dam I is located at a point <br />whence the NE comer of Section 29, Township 4 South, Range 71 West, 6~h P.M. bears North <br />85009'East, 1783 feet. . <br /> <br />i <br />f. Hiwan Reservoir No.7: The high water line of the left abutment of the daml is located at a point <br />whence the NE comer of Section 29, Township 4 South, Range 71 West, ~lh P.M. bears North <br />50050'East, 1244 feet. . I <br /> <br />I <br />g. Hiwan Reservoir No. 8 Fifth Enlargement: The reservoir outlet is located at a point whence the <br />NW comer of Section 28, Township 4 South, Range 71 West, 6th P.M. bearsl North 42030'West, <br />4480 feet. ' <br /> <br />h. Hiwan Reservoir No.9: The reservoir.. outlet i.' located at a point when1 the NW corner of <br />Section 28, Township 4' South, Range 71 West, 6th P.M. bears North 24030~Welt, 1250 feet. <br /> <br />I <br />i. Hiwan Reservoir No. 10: The reservoir outlet is located at a point whencp the NW comer of <br />Section 28, Township 4 South, Range 71 West, 6th P.M. bears North 32045'We$t, 1930 feet. <br /> <br />I <br />The parties also acknowledge that in order for Genesee to store wa~er in any of these <br />reservoirs, Genesee must comport with the conditions included in the decree~' for Case Nos. W- <br />704 9, W-7050, and 94C WI50', including b.Y. example, but not. limited t.o the'.ollowing condition: <br />the annual volume of water taken under Priority Nos. 11 and 15 shall be.limi ed to 125 . acre-feet, <br />and the period of diversion of Genesee's share of Priorities Nos. II and 15 s all be limited to the <br />I <br />period May 15 through October 31 of each year. I <br /> <br />3. The CWCB and Genesee agree that Genesee may store all' or ~ portion of theJ25 <br />acre-feet in any of the conditional reservoirs decreed in Case Nos.W-227~W155,\V1516, W1557, <br />90CW194 and.9ICWI12. However~ in.orper to store the.125acre..feetinanyoftheseconditional <br />reservoirs, Genesee must comply with the conditions of the corresponding decr es. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.