My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP01477 (2)
CWCB
>
Instream Flow Appropriations
>
DayForward
>
1-1000
>
ISFAPP01477 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:06:06 AM
Creation date
7/18/2008 10:46:20 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
94CW0259
Stream Name
Bear Creek
Watershed
South Platte
Water Division
1
County
Jefferson
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-.-' <br /> <br />. <br />~ <br /> <br />. <br /> <br />. <br /> <br /> <br />DISTRICT COURT, WATER lJIVISION 1 , STATE OF COLORADO <br /> <br />Case No. 94CW259 <br /> <br />STIPULATION <br /> <br />IN THE MA TIER OF THE APPLICA nON FOR WATER RIGHTS OF THE <br />COLORADO WATER CONSERVATION BOARD, <br /> <br />IN BEAR CREEK, A NATURAL STREAM, <br /> <br />IN THE WATERSHED OF BEAR CREEK, <br /> <br />IN JEFFERSON COUNTY, COLORADO. <br /> <br />The Applicant, Colorado Water Conservation Board ("CWCB"), and Objector Genesee <br />Water and Sanitation District ("Genesee"), by and through their undersigned attorneys, stipulate <br />and agree as follows: <br /> <br />I. Genesee agrees to the entry of a decree in this case that is no less restrictive than <br />the decree attached to this stipulation and marked as Exhibit A. <br /> <br />2. The CWCB acknowledges that Genesee has senior decreed water storage rights, as <br />decreed in Case Nos. W-7049, W-7050, and 94CW150, to store up to 125 acre-feet per year of <br />Pioneer Union Priorities 5, II, and 15 in any and all of the following storage reservoirs: <br /> <br />a. Evergreen Reservoir: Located in the S~ NW~, N~ SW~, SW~ NE~ and NW~ SE~ of <br />Section 10, Township 5 South, Range 71 West, 6th P.M. <br /> <br />b. Hiwan Reservoir No. I: The reservoir outlet is located at a point whence the NE comer of <br />Section 29, Township 4 South, Range 71 West, 6th P.M. bears North 67000' East, 750 feet. <br /> <br />c. Hiwan Reservoir No.4: The high water line of the left abutment of the dam is located at a point <br />whence the E quarter comer of Section 24, Township 4 South, Range 71 West, 6th P.M. bears north <br />OOOO'East, 715 feet. <br /> <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.