My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope_20020909
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope_20020909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:31 AM
Creation date
7/17/2008 10:30:53 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 1 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
9/9/2002
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B-2 <br />CAMP DRESSER & MCKEE INC. <br />SPDSS PHASE 1 HOURLY LABOR RATES <br />EFFECTIVE 9/1/2002 <br />HOURLY <br />BILLING <br />LABOR CATEGORIES LEVEL RATE <br />ENGINEERS/SCIENTISTS/PLANNERS: <br />JUNIOR ENGINEER/SCIENTIST 1-2 65.00 <br />STAFF ENGINEER/SCIENTIST I 3-4 82.00 <br />STAFF ENGINEER/SCIENTIST II 5-6 97.00 <br />SENIOR ENGINEER/SCIENTIST 7-8 125.00 <br />PRINCIPAL, TECHNICAL ADVISOR 9-10 150.00 <br />SUPPORT SERVICES: <br />DRAFTER 60.00 <br />CLERICAL/ADMIN 48.00 <br />WORD PROCESSOR/ADM1N 48.00 <br />OTHER DIRECT COSTS: <br />AUTO MILEAGE PER MILE 0.365 <br />PHOTOCOPY PER COPY 0.10 <br />COLOR COPIES PER COPY 1.00 <br />TELEPHONE PER MINUTE COST <br />FAX/TELECOPY PER SHEET 1.00 <br />COMPUTER AUTOCADD <br /> PER HOUR 5.00 <br />1) COSTS FOR THIRD PARTY INVOICES SUCH AS SUPPLIES, TRAVEL, RENTALS AND <br />SPECIALIZED EQUIPMENT WILL BE COSTED ON AN AS NEEDED BASIS AND BILLED <br />AT COST <br />2) A 5% HANDLING FEE WILL BE ADDED TO SUBCONTRACTOR CHARGES. <br />3) COMPANY OWNED EQUIPMENT WILL BE BILLED AT OUR CUSTOMARY RATES <br />SPDSS Groundwater SOW, Phase 1 Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.