Laserfiche WebLink
EXHIBIT B-2 <br />CAMP DRESSER & MCKEE INC. <br />SPDSS PHASE 1 HOURLY LABOR RATES <br />EFFECTIVE 9/1/2002 <br />HOURLY <br />BILLING <br />LABOR CATEGORIES LEVEL RATE <br />ENGINEERS/SCIENTISTS/PLANNERS: <br />JUNIOR ENGINEER/SCIENTIST 1-2 65.00 <br />STAFF ENGINEER/SCIENTIST I 3-4 82.00 <br />STAFF ENGINEER/SCIENTIST II 5-6 97.00 <br />SENIOR ENGINEER/SCIENTIST 7-8 125.00 <br />PRINCIPAL, TECHNICAL ADVISOR 9-10 150.00 <br />SUPPORT SERVICES: <br />DRAFTER 60.00 <br />CLERICAL/ADMIN 48.00 <br />WORD PROCESSOR/ADM1N 48.00 <br />OTHER DIRECT COSTS: <br />AUTO MILEAGE PER MILE 0.365 <br />PHOTOCOPY PER COPY 0.10 <br />COLOR COPIES PER COPY 1.00 <br />TELEPHONE PER MINUTE COST <br />FAX/TELECOPY PER SHEET 1.00 <br />COMPUTER AUTOCADD <br /> PER HOUR 5.00 <br />1) COSTS FOR THIRD PARTY INVOICES SUCH AS SUPPLIES, TRAVEL, RENTALS AND <br />SPECIALIZED EQUIPMENT WILL BE COSTED ON AN AS NEEDED BASIS AND BILLED <br />AT COST <br />2) A 5% HANDLING FEE WILL BE ADDED TO SUBCONTRACTOR CHARGES. <br />3) COMPANY OWNED EQUIPMENT WILL BE BILLED AT OUR CUSTOMARY RATES <br />SPDSS Groundwater SOW, Phase 1 Page 20 <br />