My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope4_20060915
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope4_20060915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:26:55 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 4 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
9/15/2006
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />Task 51.3 SPDSS Progress Meetings <br />The Groundwater Contractor will prepare for and attend up to 16 monthly SPDSS Progress <br />Meetings with the State. Each meeting is expected to consist of a three-hour meeting held at <br />the Groundwater Contractor's office in Denver and include discussion of progress, budget, <br />schedule and activities expected to occur in the next month. <br />Task 51.4 SPDSS Coordination Meetings <br />The Groundwater Contractor will prepare for and attend up to four SPDSS Coordination <br />Meetings with the State, the other SPDSS contractors and other parties as determined by the <br />State. These will consist of half-day meetings to report on progress, discuss coordination of <br />activities, and other topics determined by the State in advance of the meetings. Two <br />additional half-day meetings will occur with the Consumptive Use contractor to discuss <br />pumping estimates undertaken in Phase 3 Task 41. <br />Task 51.5 Peer Review Committee Modeling Workshops <br />• Four half-day meetings will beheld with the State and the Peer Review Committee to present <br />progress reports on the alluvial groundwater modeling being conducted under Task 48. It is <br />anticipated that modeling workshops will be on (1) model stress inputs and calibration targets, <br />(2) calibration results, (3} URF results and comparison to SDF values, and (4) final modeling <br />results. The Groundwater Contractor will prepare handouts and other appropriate visual aids <br />for the meetings and will prepare meeting minutes and responses to written comments from <br />meeting participants, but the Contractor will not be involved in setting up the meetings. <br />SPDSS_Phase4_gw_SOW_09-15-06.doc 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.