My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope3_20050110
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope3_20050110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:19:28 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 3 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
1/10/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />~~ <br />t~_~ ~._~ <br />testing, staff gage and piezometer installation, field surveying and water level measurement <br />activities. <br />• The field procedures developed under Phases i and 2 (for site access, control and reclamation, <br />sample testing, water level measurements, health and safety, field QA/QC protocols, and field <br />documentation requirements) will be used. .Additional procedures will be added to the <br />workplan to address conditions or data collection. activities that are new for Phase 3, including <br />streambed sediment sampling, streambed permeability testing and stream cross-section <br />surveying. <br />• Maps of the Denver Basin and Lower South Platte Regions developed in Phase 1 will be used <br />to depict areas considered by the Consultant to be high priorities for collection of streambed <br />conductance data, based on data gaps identified during Phase 2. <br />deliverables: <br />Task 33.2 Phase 3 Field Study Workplan <br />• The Consultant will develop a field study workpian that includes all field procedures <br />developed through Phase 3 of the SPDSS groundwater component. It is anticipated that this <br />workpian will be up to 20 pages in length (with additional pages for figures and appendices) <br />that will include the following additions: <br />- Target areas for Phase 3 data collection <br />- Field protocols not already included in the Phase 2 workplan <br />- Estimated budget and schedule for the Phase 3 program <br />• The Consultant will provide a digital copy (in MSWord and Adobe Acrobat PDF format) of <br />the Draft Phase 3 Field Study Workplan for the State's review. The Consultant will <br />incorporate the State's comments and recommendations. and provide a digital copy of the <br />Final Phase 3 Field Study Workplan in MSWord and Adobe Acrobat PDF formats. <br />Task 34: streambed Conductance Testing <br />Objective: <br />The objective of the streambed conductance testing is to quantify the hydraulic properties of <br />streambed materials for the mainstem South Platte River and selected tributary channels to aid in <br />characterizing surface water and groundwater interactions. This information will be used to <br />assess spatial trends in hydraulic properties of the streambed sediments and to define ranges in <br />these properties that will be used during groundwater modeling. Stream cross-sections will be <br />surveyed under this task fo,'r use in groundwater modeling. <br />SPDSS Groundwater SOW, Phase 3 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.