Laserfiche WebLink
\/V ~) <br />EXHIBIT D-3 <br />Task Compensation <br />SPDSS Groundwater Component -Phase 3 <br />January 10, 2005 <br />Task Description Total Cost <br />30 Collect Historic Pumping Data $31,000 <br /> 30.1 Collect Data $31,000 <br />33 Workplan Development $7,500 <br /> 33.1 Design $4,500 <br /> 33.2 Workplan $3,000 <br />34 Streambed Conductance Testing $195,000 <br /> 34.1 Field Data Collection $164,400 <br /> 34.2 Surveying $24,600 <br /> 34.3 Technical Memorandum $6,000 <br />35 Alluvial Well Construction & Testing $11,065 <br /> 35.4 We11 Construction $11,065 <br />36 Bedrock Well Construction & Testing $7,372 <br /> 36.3 .Well Construction $7,372 <br />39 Collection of Water Level Measurements $96,000 <br /> 39.1 Data Collection $30,000 <br /> 39.2 Long-term Monitoring $17,000 <br /> 39.3 Surveying $44,000 <br /> 39.4 Denver Basin Tech Memo $5,000 <br />41 Pumping Estimates $70,000 <br /> 41.1 Pumping Estimates $66,000 <br /> 41.2 Technical-Memorandum $4,000 <br />42 Aquifer Configuration Data Analysis $3,252 <br /> 42.4 Data Analysis $3,252 <br />43 Aquifer Property Data Analysis $2,532 <br /> 43.4 Data Analysis $2,532 <br />44 Aquifer Water Level Data Analysis $29,541 <br /> 44.1 Analyze and Map Data $24,541 <br /> 44.2 Technical Memorandum $5,000 <br />47 Denver Basin Modeling Coordination $18,000 <br /> 47.1 Model Coordination $18,000 <br />48 Alluvial Modeling $268,000 <br /> 48.1 Model Development $243,000 <br /> 48:2 Model Report $25,000 <br />50 Model Enhancements $61,000 <br /> 50.:1 GUI Review $10,000 <br /> 50.2 DMI Development $41,000 <br /> 50:3 Coordination $4,000 <br /> 50.4 Technical Memorandum $6,000 <br />SPDSS Groundwater SOW, Phase 3 23 <br />