My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope3_20050110
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope3_20050110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:19:28 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 3 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
1/10/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G <br />/~-~/`j i 111 <br />~" 1._ <br />EXHIBIT B-3 <br />CAMP DRESSER & MCKEE 1NC. <br />SPDSS PHASE 3 HOURLY LABOR RATES <br />EFFECTIVI's 01/10/2005 <br />HOURLY <br />BILLING <br />LABOR CATEGORIES LEVEL RATE <br />ENGINEERS/SCIENTISTSlPLANNERS: <br />JUNIOR ENGINEER/SCIENTIST 1-2 75.00 <br />STAFF ENGINEER/SCIENTIST I 3-4 92.00 <br />STAFF ENGINEER/SCIENTIST II 5-6 110.00 <br />SENIOR ENGINEER/SCIENTIST 7-8 150.00 <br />SENIOR TECHNICAL ADVISOR 9-10 170.00 <br />SUPPORT SERVICES: <br />DRAFTER/TECHNICIAN <br />CLERICAL/ADMIN <br />WORD PROCESSOR/ADM1N <br />OTHER DIRECT COSTS: <br />PER MILE <br />PER COPY <br />PER COPY <br />PER MINUTE <br />PER SHEET <br />PER HOUR <br />75.00 <br />55.00 <br />55.00 <br />IRS RATES (currently $ 0.375) <br />0.10 <br />1.00 <br />AT COST <br />1.00 <br />5.00 <br />1) COSTS FOR TH1RD PARTY INVOICES SUCH AS SUPPLIES, TRAVEL, RENTALS AND <br />SPECIALIZED EQUIPMENT WILL BE COSTED ON AN AS NEEDED BASIS AND BILLED AT <br />COST <br />2) A 5% HANDLING FEE WILL BE ADDED TO SiJBCONTRAC;TOR CHARGES. <br />3) COMPANY OWNED EQUIPMENT WILL BE BILLED AT OUR CUSTOMARY RATES <br />SPDSS Groundwater SOW, Phase 3 <br />22. <br />
The URL can be used to link to this page
Your browser does not support the video tag.