My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope3_20050110
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope3_20050110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:19:28 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 3 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
1/10/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~t-~ ~~~ <br />all files necessary to reproduce the figures following the project GIS conventions that will be <br />provided by the spatial data contractor. Data in digital format suitable for importation into <br />Hydrobase will be provided. <br />Task 41: Develop Municipal and industrial Pumping Estimates <br />Objective: <br />The objective of this task is to develop estimates of municipal and industrial (M&), groundwater <br />.pumping for the bedrock and alluvial aquifers within the study area for the period 1950 to present, <br />based on historic pumping records obtained in Task 30 and engineering judgment. <br />Approach: <br />Task 41.1 Estimates of Pumping <br />• M&I pumping for up to 100 municipalities and large industrial users will be developed on a <br />monthly time step from 1950 to present. Creation of the monthly pumping values will depend <br />on the type of data collected in Task 30. It is anticipated that it may require interpolation from <br />annual values, especially for early time periods., The pumping estimates will be created in a <br />format suitable for import to Hydrobase.. <br />Deliverables: <br />Task 41.2 Pumping Estimates Technical Memorandum <br />A report documenting the methodology used in developing the pumping estimates will be <br />prepared.. This report will include tabular and graphical summaries of results. The database <br />will be provided in a format suitable for import to Hydrobase. The text is .anticipated to be up <br />to 15 pages, not including figures and tables. . <br />The Consultant will provide a digital copy (in MSWord and Adobe Acrobat PDF format) of <br />the Draft Technical Memorandum for the State's.review. The Consultant will incorporate the <br />State's comments and recommendations and provide a digital copy of the Final Technical <br />Memorandum in MSWord and Adobe Acrobat PDF formats. Figures that are prepared in <br />GIS format. will also be provided in electronic ArcGIS format including supporting metadata <br />descriptions and ail files necessary to reproduce the figures following the project GIS <br />conventions that will be provided by the spatial data contractor. Data in digital format <br />suitable for importation into Hydrobase will be provided. <br />SPDSS Groundwater SOW, Phase 3 i0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.