Laserfiche WebLink
~1 ~~ <br />EXHIBIT A-3 <br />Scope of Work <br />South Platte Decision Support System Phase 3 <br />Ground Water Component <br />January 10, 2005 <br />Introduction <br />Following is the Phase 3 Scope of Work for the ground water component of the South Platte <br />Decision Support System (SPDSS). The Scope of Work is based on the SPDSS Feasibility Study <br />(FS) final report dated October 2001 and from work associated with Phases 1 and 2. The data <br />collection and analysis activities will occur within the Denver Basin and the Lower South Platte <br />Regions and are an extension of data collection that occurred in Phases 1 and 2. <br />The SPDSS implementation will occur in phases. The objectives of this Phase 3 ground water <br />scope of work are to build on work that was done in Phases 1 and 2, and are as follows: <br />• Develop estimates of municipal and industrial (M&I) well pumping, <br />• Collect field data to estimate the hydraulic properties of streambed material of the South <br />Platte River and key tributaries, <br />• Survey stream channel cross-sections <br />• Collect water level data, <br />• Survey locations and elevations for wells in the water level monitoring network <br />• Enhance HydroBase and Phase 1 and 2 memoranda describing our understanding of the <br />groundwater system based on Phase 3 data. <br />• Develop a "pre-development" groundwater model of alluvial aquifers in the study area, <br />• Review and monitor USGS modeling efforts for bedrock aquifers of the Denver Basin. <br />Table 1 lists the Phase 3 ground water activities identified in the SPDSS Feasibility Study to <br />achieve these objectives. The Task numbers were assigned by the Colorado Water Conservation <br />Board, the lead agency on this project, with activities corresponding to those listed in Appendix C <br />of the SPDSS Feasibility Study. Cost and schedule to complete these Phase 3 tasks are presented <br />in Exhibits B-3 through D-3, which are attached at the end of this Scope of Work. <br />SPDSS Groundwater SOW, Phase 3 <br />