Laserfiche WebLink
<br />Exhibit ]B-1 <br />Rate Schedule -Phase 3 <br />South Platte Decision Support System <br />Spatial System Integration Component <br />November 19, 2004 <br />Riverside Technology, inc. <br />~~ <br />PRINCIPAL, TECHNICAL ADVISOR <br />Doug Greer, Rti Principal in Charge $ 146 <br />SENIOR ENGINEER/SCIENTIST <br />Tim Martin, Sr. Project Manager $ 146 <br />Steve Malers, Senior Systems Engineer $ 140 <br />Stan Woodcock, Database Analyst $ 114 <br />Amnon Nevo; Sr. GIS Programmer and Software Engineer $ 109 <br />Paul Weiss, Water Resources Engineer $ 105 <br />James VanShaar, Water Resources Engineer $ 90 <br />Amnon Nevo, Sr. GIS Specialist $ 92 <br />ENGINEER/SCIENTIST <br />Claudio Schneider, Remote Sensing Specialist $ 70 <br />Nils Babel, GIS Specialist $ 65 <br />Kelly Scott, Agricultural Engineer and GIS Specialist $ 69 <br />Victor Lee, Water Resources Engineer and-GIS Specialist $ 65 <br />Veronica Velasco, Water Resources Engineer acid GIS Specialist $ 60 <br />Kevin Geiger, Remote Sensing and GIS Technician $ 48 <br />SOFTWARE ENGINEER <br />Thomas Sapienza $ 88 <br />CLERICAL/ADMIN <br />Karin Wirthlin $ 47 <br />Laura Baker $ 47 <br />Sarah Baldwin $ 47 <br />Other staff will be billed according to their labor categories at the time charges are incurred, at the rates <br />shown, attached. <br />1 <br />