Laserfiche WebLink
<br />supply plans prior to .augmentation plans, will be documented. Note that the previous <br />GASP substitute supply plan will be included for review, and potentially other plans no <br />longer in operation based on recommendations from Division 1. Approximately 10 phone. <br />interviews with plan/transfer owners and water commissioners are expected. <br />Recommendations will be made on the minimum level of detail required to represent <br />operation of plans/transfers in surface water modeling efforts. <br />Deliverables: <br />7.1 A technical memorandum describing the review of historic call data over the SPDSS <br />study period (1950 through present). The memorandum will include a characterization of <br />calls and their affect on administration over time. A HydroBase compatible data set will <br />be provided to the State's database administrator for inclusion in HydroBase. <br />7.2 Technical memorandum describing the largest 10 plans/transfers, including history and <br />accounting procedures. The memorandum will include recommendations for the inclusion <br />of the plans/transfers into HydroBase and the surface water modeling efforts. <br />Task 16 -StateMod Enhancement Review <br />Background: <br />The feasibility study recommended StateMod be enhanced by State personnel to better represent <br />river administration and operations in the South Platte. During Phase 1 data collection, several <br />modeling enhancements have been recommended, including incorporating additional information <br />from StateCU regarding the use of reservoir water within an irrigation system. In addition, <br />recommendations will be made during Phase 3 Task 7 efforts that may require StateMod code <br />refinement. <br />Objective: <br />Provide a peer review of StateMod enhancements to confirm they operate as intended for use in <br />the South Platte River Basin and other parts of the State. <br />Approach: <br />16.1 Coordinate with the State's StateMod maintenance personnel to identify specific <br />enhancements. Run scenarios and review results. Document the peer review process to <br />verify that the code operated correctly in a memorandum. Specific enhancements, as <br />recommended in the Feassibility_ Study, may include -operating rules- to incorporate <br />augmentation plans, transfers and exchanges; refinement of daily time step operations to <br />include routing of daily flows; including a river priority call function; improvements of <br />interactions with other DSS application models; and enhancement of linkage capabilities <br />with CRDSS models. <br />Deliverables: <br />16.1 A technical memorandum documenting the StateMod Enhancements, example data sets, <br />review process, and results of the review. <br />Exhibit A-1Page 7 <br />