My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UpperColo_BasinReport_20070101
CWCB
>
Decision Support Systems
>
DayForward
>
UpperColo_BasinReport_20070101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:52:39 AM
Creation date
7/11/2008 1:32:05 PM
Metadata
Fields
Template:
Decision Support Systems
Title
Upper Colorado Rover Basin Information
Description
General information regarding surface water projects and operations within the Upper Colorado River basin.
Decision Support - Doc Type
Basin Report
Date
1/1/2007
DSS Category
Surface Water
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153933, C154062
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
provide regulation of the peak runoff volumes for delivery to the Adams Tunnel; (d) The Granby <br />Pumping Plant and Pump Canal, used to deliver water from storage in Granby Reservoir to Shadow <br />Mountain Reservoir, (e) Willow Creek Reservoir and the Willow Creek Pump Canal, used to import <br />additional waters from the adjacent Willow Creek drainage; and (f) Green Mountain Reservoir, <br />constructed on the Blue River for purposes of protecting Western Slope water users from injury as a <br />result of the CBT operations. Each of these facilities will be discussed in more detail in the following <br />documentation. <br />Water from the CBT Project is initially delivered on an allocation basis only to owners of allotment <br />contracts with the NCWCD. A total of 310,000 shares, or units are outstanding. The Board of <br />Directors of the NCWCD annually declares a quota, setting the amount of water to be delivered to <br />each unit. A quota of 100 percent would entitle each unit to delivery of one acre-foot of <br />supplemental water delivered from the project. Similarly, a 50 percent quota would entitle each unit <br />to delivery of 0.5 acre-foot. Historically, the project deliveries have averaged about 230,000 acre- <br />feetper year, representing an average quota of about 75 percent. Water rights for the CBT Project <br />are summarized in Table 2.1. <br />Table 2.1 <br />Colorado -Big Thompson Project Water Rightsl <br /> Decreed Amount <br />Name WDID Absolute Conditional <br />NORTH FORK COLORADO RIVER <br />Alva B. Adams Tunnel 514634 550 cfs <br />Shadow Mountain Reservoir /Grand Lake 513695 19,669 ac-ft <br />Granby Reservoir 514620 543,758 ac-ft <br />Granby Pump Canal 510678 1,100 cfs <br />WILLOW CREEK <br />Willow Creek Reservoir 513710 10,553 ac-ft <br />Willow Creek Pump Canal 510958 400 cfs <br />BLUE RIVER <br />Green Mountain Reservoir2 363543 154,645 ac-ft 154,645 ac-ft <br />Green Mountain Reservoir3 363543 6,316 ac-ft <br />Green Mountain Direct Flow Hydro-Electric 363543 1,726 cfs <br />' Allrights: Adjudication date October 12, 1955 <br />Appropriation date August 1, 1935 <br />Administration number 31258.00000 <br />z Green Mountain Reservoir also holds a junior conditional refill right for 154,645 acre-feet. <br />s Second fill. <br />Upper Colorado River Basin Information 2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.