My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_15-21_OperationsOfTaylorParkBlueMesaReservoirs
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_15-21_OperationsOfTaylorParkBlueMesaReservoirs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:32:33 AM
Creation date
7/11/2008 12:00:32 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.15-21 - Water Rights Planning Model - Operations of Taylor Park and Blue Mesa Reservoirs
Description
This task memorandum describes the Taylor Park/Blue Mesa exchange agreement.
Decision Support - Doc Type
Task Memorandum
Date
1/9/1995
DSS Category
Surface Water
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The first water flowing into Taylor Park Reservoir during the water year (water that is available <br />? <br />under the priority of the UVWUA water storage right), shall be charged against the one annual <br />filling of the UVWUA water storage up to the extent of the one annual filling. <br /> <br />The next water flowing into Taylor Park Reservoir during the water year (water that is available <br />? <br />under the priority of the Upper Gunnison River Water Conservancy District water storage right <br />decreed in Case No. 86CW203 for the refilling of Taylor Park Reservoir), shall be charged <br />against the one annual filling of the Upper Gunnison District water storage right up to the <br />extent of the one annual filling. <br /> <br />Outflows that occur from Taylor Park Reservoir that exceed patterns set forth in paragraph 22 <br />? <br />of the decree in Case No. 86CW203 shall not be considered releases from water stored under <br />either the UVWUA's or the Upper Gunnison District's water storage rights. <br /> <br />Releases that are made from the Taylor Park Reservoir shall be charged first against the water <br />? <br />stored under the UVWUA's water storage right, and shall be considered as having been used <br />pursuant to UVWUA's obligations and the Upper Gunnison District's rights under the 1975 <br />agreement. Such releases shall establish credits in Blue Mesa Reservoir pursuant to the above- <br />mentioned contracts. In the event that such releases exceed the water stored under the <br />UVWUA's water storage right in Taylor Park Reservoir, the deficiency shall be charged against <br />the water stored under the Upper Gunnison District's water storage right under Case No. <br />86CW203. Any water belonging to the Gunnison District that is in storage on October 31 shall, <br />on that date, become part of the UVWUA's water storage right according to paragraph 5 of the <br />April 16, 1990, contract. <br /> <br />Water delivered to and diverted into the Gunnison Tunnel from the UVWUA's storage supplies <br />? <br />shall be first charged against the UVWUA's credit water in Blue Mesa Reservoir. <br /> <br />When additional water supplies are needed by the Upper Gunnison District for irrigation <br />? <br />purposes, and when such water is available from Taylor Park Reservoir under the water right in <br />Case No. 86CW203, releases of such water shall be made. These releases will be charged <br />against the water stored under the Upper Gunnison District water storage right, and shall be <br />limited to not more than 19,200 acre-feet of water in any one year. <br /> <br />If, and when, the Division Engineer determines that it is necessary to charge evaporation <br />? <br />against the reservoirs in the Gunnison River Basin, the accounting conditions shall be modified <br />appropriately to accommodate evaporation. <br />Operation of the Taylor Park/Blue Mesa Exchange in the CRDSS Program MODSIM <br />The following describes the key assumptions used in the CRDSS water rights planning model <br />(MODSIM) to simulate the operations of Taylor Park Reservoir and the Aspinall Unit. <br />Blue Mesa Reservoir is simulated using three storage accounts: 1) the Blue Mesa senior <br />? <br />storage decree for 940,755 acre-feet, 2) the Blue Mesa junior storage decree for 122,702 acre- <br />feet, and 3) UVWUA's exchange credit account. <br /> <br />7 <br />A275 01.09.95 1.15-21 Fosha, Hyre <br />
The URL can be used to link to this page
Your browser does not support the video tag.