My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_15-2_WaterRightsPlanningModelEvaluationCriteria
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_15-2_WaterRightsPlanningModelEvaluationCriteria
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:32:33 AM
Creation date
7/11/2008 9:34:10 AM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.15-2 - Water Rights Planning Model - Model Evaluation Criteria
Description
In order to select a suitable water rights planning model that will address the goals and objectives of the CRDSS, an objective methodology to evaluate model functionality and performance was developed.
Decision Support - Doc Type
Task Memorandum
Date
5/10/1994
DSS Category
Surface Water
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PART II: MODEL SOLUTION CAPABILITIES AND PERFORMANCE <br />CONCEPTS <br />1. Ability to understand overall model solution concepts <br />2. Confidence level in results <br />a. Sensitivity of results to input & operation rules <br />b. Ability to maintain continuity of mass balance <br />3. Consumptive use/stream depletion <br />4. Return flows related to the following: <br />a. Initial time-step for lagging <br />b. Length of lagging <br />c. Single return flow factor of lag factor tables <br />5. Hydropower simulation <br />a. Demand on stream <br />b. Calculation of power generation <br />6. Reservoir accounting related to the following: <br />a. Multiple priorities <br />b. Multiple ownerships <br />c. Release criteria <br />d. Evaporation <br />7. Water rights: <br />a. Same priorities <br />b. New conditional rights <br />c. General subordinations <br />8. Simulation of exchanges related to the following: <br />a. Direct flow node to direct flow node <br />b. Reservoir to direct flow node <br />c. Exchange "potential"/intervening water rights <br />9. Evaporation solution related to the following: <br />a. Solution techniques <br />b. Data requirements <br />10. In-stream flow rights: <br />a. Solution techniques <br />b. Data requirements <br />11. Simulation of baseline/adjusted flow <br />12. Time step simulation (daily; monthly; weekly) <br />13. Overall speed (execution time) <br />4 <br />A275 05.10.94 1.15-2 Fosha, Hyre <br />
The URL can be used to link to this page
Your browser does not support the video tag.