My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RGDSS_SurfaceWater_ScopeOfWork
CWCB
>
Decision Support Systems
>
DayForward
>
RGDSS_SurfaceWater_ScopeOfWork
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:33:25 AM
Creation date
7/10/2008 1:43:06 PM
Metadata
Fields
Template:
Decision Support Systems
Title
RGDSS Surface Water Scope of Work
Description
The objectives of this scope of work are as follows: 1) To apply and enhance an existing data centered surface water modeling system to the San Luis Valley that interacts with the State's central database (HydroBase) and other RGDSS planning tools. 2) To calibrate and test, via application, a San Luis Valley Surface Water Model that, is 100% data centered. 3) To coordinate and share the surface water investigations with SLV water users, the State, a technical subcommittee and other RGDSS contractors.
Decision Support - Doc Type
Scope of Work
Date
11/8/1998
DSS Category
Surface Water
DSS
Rio Grande
Basin
Rio Grande
Contract/PO #
C153863
Grant Type
Non-Reimbursable
Bill Number
HB98-1189, SB99-173
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1 <br />Task Description Page <br />1 Obtain Local Copy of StateMod, DMI's, HydroBase 5 <br />2 Identify Study Period 7 <br />3 Review Past Modeling Efforts 9 <br />4 Conduct Basin Meetings 10 <br />5 Verify StateMod Enhancements 12 <br />6 Develop Phase la Historic Monthly Model (approx. <br />75% Surface Water Use) 13 <br />7 Develop Phase lb Historic Model Phase lb (100% <br />Surface Water Use) 19 <br />8 Develop Phase lc Historic Monthly Model (100% <br />Surface and Ground Water Use 21 <br />9 Develop Phase 1 Calculated Monthly Model 24 <br />10 Develop Phase 1 Monthly Baseline Data 25 <br />11 Develop Phase 1 Monthly Model Report 26 <br />12 Phase 1 User Involvement 26 <br />13 Phase 1 Management 27 <br />14 Phase 1 Contingency 28 <br />15 Develop Phase 2 Model (Daily) 29 <br />16 Planning Scenario Application 31 <br />17 Phase 2 User Involvement 33 <br />18 Phase 2 Management 33 <br />19 Phase 2 Contingency 34 <br />20 Develop Phase 3 Model (Monthly & Daily) 34 <br />21 Phase 3 User Involvement 36 <br />22 Phase 3 Management 36 <br />23 Phase 3 Contingency 37 <br />RGDSS Surface Water Scope of Work 2 11/8/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.