My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_RobertsTunnel
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_RobertsTunnel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:52:20 AM
Creation date
7/10/2008 9:06:22 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, Harold D. Roberts Tunnel
Description
The Harold D. Roberts Tunnel has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
4/6/2004
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPDSS Memorandum <br />Final <br />To: <br /> Ray Alvarado and Ray Bennett <br />From: <br /> LRE – Mary Presecan and Erin Wilson <br />Subject: <br /> Task 5 – Key Structure, Harold D. Roberts Tunnel <br />Date: <br /> April 6, 2004 <br />INTRODUCTION <br />One of the Task 5 objectives is to: <br />Develop and document an understanding of the op erations of key wate r use facilities in <br />the basin in order to facilitate consumpti ve use modeling and to support selected data <br />needs for modeling being done by other contractors. This understanding will be <br />developed through interviews with DWR pe rsonnel, operators of large canal and <br />reservoir systems, and representa tives of federal facilities. <br />Types of key water use facilities include di version structures, transmountain diversions, <br />reservoirs, and reservoir systems. <br />Key diversion structures, identi fied as part of Task 3, incl ude structures representing 85 <br />percent of net decreed rights, structures dive rting greater than 1,000 acr e-feet per year (ac- <br />ft/yr), and structures of administrative importance. <br />Key transmountain diversions, identified as part of Task 4, include th ose structures that <br />transport non-native water from another ba sin into the South Pl atte River basin. <br />Key reservoirs, identified as pa rt of Task 5, include reservoi rs or reservoir systems with <br />greater than 10,000 acre-feet (ac-ft ) capacity and/or reservoirs that should be included in <br />potential future modeling efforts due to thei r impact on basin operations. Reservoir systems <br />are defined as a group of reser voirs on the same tributary or filled by the same diversion <br />structure that satisfy a common demand or are operated in a similar fashion. <br />The Harold D. Roberts Tunnel has been identif ied as a key structure for the South Platte <br />Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The <br />purpose of this Task 5 memorandum is to docum ent physical, legal, and operational aspects of <br />those key structures identified. <br />Table of Contents Page <br />The information provided in this memorandum was <br />Introduction 1 <br />developed from publicly accessibl e sources. Information in <br />System Overview 2 <br />this memorandum is believed to be accurate. However, this <br />Physical Information 4 <br />information should not be relied upon in any legal <br />Water Rights 6 <br />proceeding. <br />Operational Information 7 <br />Comments and Concerns 8 <br />References 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.