My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_GrandRiverDitch
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_GrandRiverDitch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:37:05 AM
Creation date
7/9/2008 12:58:33 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, Grand River Ditch
Description
The Grand River Ditch has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
4/6/2004
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Diversions through Grand River Ditch may be turned off completely if there is excessive rain or <br />water in the basin and the act of importing addi tional water could increase the possibility of flood <br />conditions. <br />Where to find more information <br />Specifics relating to the data collection and f illing processes used in the determination of <br />the best source of data are presented in the SPDSS Task 4 Memorandum – Identify and <br />Fill/Resolve Conflicting R ecords for Key Transmountain Diversion Structures. <br />Additional information on ditch and reservoi r operations within Water District 3 is <br />presented in the Water District 3 Meeting Notes prepared for SPDSS Task 3 – Identify <br />Key Diversion Structures. <br />Additional information regarding the operating practices for the Water Supply and <br />Storage Company is presente d in the Water Supply and Storage Company Memorandum <br />prepared for the SPDSS Task 5 – Key Structures. <br />COMMENTS AND CONCERNS <br />None. <br />REFERENCES <br />1. Colorado Water Resources & Powe r Development Authority. 1987. Cache la Poudre Basin <br />Study . <br />2. Department of Civil Engineering Colorado Stat e University Fort Collins, Colorado. 1996. <br />Input-Output Modeling of the Cache la Poudre Water System . <br />3. George Varra. Water Commissioner Divi sion 1, District 3. Phone: (970) 484-1628 <br />4. Rocky Mountain Consultants, Inc. 1990. Engineering Documentation for Change of Use of <br />the City of Thornton’s Shares in the Wate r Supply & Storage Company and Jackson Ditch <br />Company 87CW332 . <br />5. Water Right Data. Divisi on of Water Resources. http://water.state.co.us/ <br />6. Water Supply and Storage Company. Telephone conversation with Fred Walker, president. <br />7. Winchester, John N. 2001. A Historical View: Transmount ain Diversion Development in <br />Colorado. Technical paper presented at: Trans Basi n Water Transfers, Proceedings of the <br />2001 Water Management Conference, US Committ ee on Irrigation and Drainage. June 27 – <br />30, 2001. <br />GrandRiverDitch.doc 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.