My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_FRICO-Standley
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_FRICO-Standley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:37:05 AM
Creation date
7/9/2008 12:49:57 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, FRICO-Standley Lake Cities
Description
FRICO–Standley Lake Cities has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
12/22/2006
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Task 5 Summary –Key Reservoirs memorandum for more information on filling <br />missing storage contents data. <br />Figure 5 <br />The historical record in illustrates the change in storag e capacity in the reservoir over <br />time. The annual pattern illustrates the more signifi cant drawdown in the reservoir that occurred <br />when it was used primarily for irrigation follo wed by less drawdown as operations have shifted <br />to more municipal use. <br />Standley Lake Delivery Structures: <br />The following structures deli ver water from Standley <br />Lake to municipalities or lands within the FRICO–Standley Lake Division. <br />Municipal Deliveries <br />: All of the Standley Lake Cities receive wate r through pipelines coming <br />out of Standley Lake, as discussed furthe r in the Operational Information section. <br />Irrigation Deliveries <br />: Water is delivered to FRICO irriga tors down Big Dry Creek into the Bull <br />Canal system or the German Ditch system. <br /> Bull Canal <br /> In addition to irrigation deliveries from Standley Lake, municipal water supplies are <br />treated by the City of Northgle nn at its wastewater treatment facility and then discharged <br />to Bull Canal Reservoir (Structure ID 0203351 - 4,116 ac-ft total cap acity; 313 ac-ft dead <br />storage; 3,803 ac-ft active storage capaci ty) and the Bull Canal system. FRICO share <br />13 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.