My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_FRICO-Milton
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_FRICO-Milton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:37:05 AM
Creation date
7/9/2008 12:37:11 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, FRICO-Milton Lake Division
Description
The FRICO–Milton Lake Division has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
3/3/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HydroBase Data: <br /> Historical end-of-month storage reco rds a r e ava ilab l e f o r Milton L a ke in <br />HydroBase under Structure ID 0203876 for m o st of the 1950 through 2003 SPDSS study <br />period. Diversion records from Milton Lake are available in HydroBase under the sam e <br />Structure ID for the years 1965, 1996, and 2002 only. <br />Figure 2 <br />The annual pattern exhibited in the end-of -m ont h reservoir storage, as shown in , <br />reflects the typical op erati ng schedule discussed in the subsequent Operational <br />Inform ation section of this m e m o. Reservoi r sto r age typically reaches a m a xi m u m each <br />year between April and June. Reservoir le vels drop throughout the irrigation season <br />reach ing the lowest level late in the ir rigation season, typically between August and <br />October. Through the winter storage pe riod of Novem b er through May, a m i ni m a l <br />am ount of water is diverted into the reser voir and return flows from the Beebe Canal <br />slowly increase the end-of- m onth storage leve l. Milton L a ke is not typically filled to <br />capacity. W a ter is typ i ca lly r e lea s ed f o r irrigation beginning in May and continuing <br />through Septem ber or October. <br />Figure 2: Milton Lake Histo rical End-of-Month Storage <br />Diversion coding of the historic al d i vers ion r e c o rds ind i ca tes tha t wate r is dive rted into <br />Barr Lake through the Evans No. 2 Ditch. Histori cal reservoir releas e records are not <br />available through HyrdoBase, however, inflow and releases are m easured by FRICO and <br />provided to the W a ter Commissioner. <br />FRICO_Milton.doc 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.