My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01798 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01798 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2011 2:47:56 PM
Creation date
7/9/2008 9:29:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150265
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONONE <br />Introduction <br />~ 1.1 STUDY PURPOSE <br />~ The purpose of the Knouth Reservoir Project is to enhance the means for SIDC to continue <br />providing irrigation water to shareholders by adding another storage option to their present <br />~ system. The purpose of this study was to update the 2003 Study. The study goals included the <br />following: <br />1. Identify the cause of two seepage areas, one along the maYimum section at the north <br />embat~nent and one at the south embankment; <br />2. Prepare mitigation alternatives that would reduce the seepage and allow permanent water <br />storage in the reservoir; and <br />3. Prepare alternatives tHat would address other SEO dam safety concerns related to the <br />spiilway capacity, structural conditions of the north and south outlets, and vegetation <br />growth along the upstream and downstream dam faces. <br />1.2 SCOPE OF WORK <br />This study was divided into four tasks which included 1) Task 1- Drilling Program, 2) Task 2- <br />Laboratory Program, 3) Task 3- Outlet Inspection, and 4) Task 4- 2003 CWCB Feasibility <br />Study Update. <br />Task 1- Drilling Program <br />The goals of the drilling program was to collect field samples for laboratory testing, identify <br />seepage causes, and verify findings and recommendations in the 2003 Study related to <br />geotechnical related issues. <br />T'he dritling program consisted of seven borings; five borings along the north embankment and <br />two borings along the south embankment. Four borings of the five borings along the north <br />embankment were located along the dam crest with the fifth boring located at the downstream <br />toe of the dam. Two borings along the south embankment were located along the dam crest. <br />~ '(~,,5 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.