My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01798 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01798 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2011 2:47:56 PM
Creation date
7/9/2008 9:29:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150265
Contractor Name
Supply Irrigating Ditch Company
Contract Type
Loan
Water District
0
County
Boulder
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONTHREE <br />Background Informadon <br />In 2003 a total of 633 AF of water was diverted through the Supply Ditch with an additianal 300 <br />AF provided from Beaver Park Reservoir. The River yield was higher than in 1954 but the yield <br />from Beaver Park reservoir was less than in 1954. <br />For an average year, during the period of study by RMS, the average diversion was 5,129 AF <br />from the Supply and 1,305 AF from Beaver Park Reservoir. An analysis of consumptive use <br />provided in the above stated report is shown in Table 3-2. <br />Tab1e 3-2 <br />Irrigation Demand <br />Crop Type Water Demand <br />(AF/acre) Acres Totai Demand <br />(AF) <br />Alfalfa Hay 2.45 4,000 9,800 <br />Corn 1.72 2,500 4,300 <br />Grain 1.31 1,350 1,760 <br />Beets 232 600 1,390 <br />Pasture 2.25 50 112 <br />TOTALS 8,500 17,362 <br />3.4 PROJECT LANDS <br />Knouth Reservoir storage will not change as a result of this project. This project will not <br />broaden SIDC's service area and will not provide for irrigation of any new lands. The present <br />lands irrigated are 8,500 acres as stated above. <br />3.5 WATER QUALITY <br />There will be no water quality impacts as a result of this project, nor will there be any new water <br />supplies developed as a part of this project for which water quality will need to be addressed. <br />Construction dewatering, process waters, and diversions will be performed in accordance with <br />required federal; state, and local permit conditions. <br />t,~,,S 3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.