Laserfiche WebLink
Supply Irrigating Ditch Company <br />Knouth Reservoir Dam Rehabilitation <br />June 11, 2008 <br />Page 2 of 2 <br />C) Design/Construction: You must adhere to the CWCB Design and Construction Administration <br />Procedures. Tim Feehan will contact you regarding this phase of the process. Tim will make <br />construction site visits, which will be the basis of pay estimates for disbursement of your loan <br />funds. You can contact Tim at his desk at (303) 866.3480 or cell phone (303) 618.5010. <br />On behalf of the Board, I would like to thank you for your interest in a loan from the Colorado Water <br />Conservation Board. <br />Sincerely, <br />q��'6''r-� .�,t'� �'�� <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Attachment: Updated Board Memo <br />E-mail Copy (Including Attachments) <br />Anna Mauss, P.E. <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Eric Wilkinsan, Board Member - South Platte River Basins <br />Ed Toms, PE, URS Consultants <br />Amy Stengel, AGO <br />CWCB Finance Section Staff <br />