My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RGDSS_Task9-2_CalculatedMonthlyModel_CalculatedOperatingRules
CWCB
>
Decision Support Systems
>
DayForward
>
RGDSS_Task9-2_CalculatedMonthlyModel_CalculatedOperatingRules
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:35:54 AM
Creation date
7/8/2008 9:42:02 AM
Metadata
Fields
Template:
Decision Support Systems
Title
RGDSS Task 9-2 - Phase 1 Calculated Monthly Model - Develop Calculated Operating Rules
Description
Memo documenting development of calculated operating rules.
Decision Support - Doc Type
Task Memorandum
Date
10/23/2000
DSS Category
Surface Water
DSS
Rio Grande
Basin
Rio Grande
Contract/PO #
C153863
Grant Type
Non-Reimbursable
Bill Number
HB98-1189, SB99-173
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RGDSS Memorandum <br />Final <br />TO: Ray Bennett <br />FROM: Ed Armbruster, Hydrosphere <br />SUBJECT: RGDSS Surface Water, Task 9.2 -Develop Calculated Operating Rules <br />DATE: October 23, 2000 <br />CC: Randy Seaholm <br />Introduction <br />This memorandum represents delivery associated with Task 9.2 (Develop Calculated Operating <br />Rules). The objective ofthis task was as follows: <br />Develop operating rules required to simulate the surface water model in calculated mode. <br />Development of the Rio Grande Surface Water Model is proceeding through a phased <br />development approach. The model was first created and run in Historic mode, whereby historical <br />diversion, pumping, reservoir storage and other operational data are used as input for model <br />demands and operating criteria. The model is then calibrated against these historical data sets. <br />In Calculated mode, the model is being developed to run using demands that are calculated with <br />the Consumptive Use model (which develops agricultural irrigation water requirement (IWR) <br />demands based on cropping, climate, and acreage data). In addition, reservoir operations defined <br />in historic mode are revised in the calculated mode in order to simulate water use according to <br />currently understood operating practices. These reservoir operating practices are controlled by the <br />operating rights file. <br />Historic Scenario Operating Rights <br />The operating right file in a StateMod application allows user-defined operating practices to be <br />simulated as part of the prior appropriation doctrine. The historic mode has 348 unique operating <br />rules defined in the Rio Grande surface water model. These rules define a variety of water <br />management and water use activities and practices in Division 3, and fall into four general <br />categories of operations: Reservoir use, carrier diversion structures, split river channels and <br />Compact Operations. These operating rules are discussed in detail in a memorandum <br />documenting Task 6.10 of the Surface Water Contract (Prepare Operating Criteria File), and are <br />summarized in Table 1. Additional information concerning operating rules that can be <br />implemented in the StateMod modeling system can be found in the StateMod documentation <br />available through the Colorado Decision Support web site (http://cdss.state.co.us). <br />C:Acdss\Task9-2.doc Calculated Operating Rules October 23, 2000 -Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.