My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150266 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150266 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 9:51:36 AM
Creation date
7/7/2008 11:14:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150266
Contractor Name
Granby Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Feasibility Study <br />Granby Ditch and Reservoir Co. <br />Granby #12 Dam <br /> <br />Introduction (Need for the Project) <br /> <br />The Granby Ditch and Reservoir Co (G.D.R.C.) owns and operates <br />Granby Reservoir #12 as an irrigation water storage reservoir for the <br />benefit of the shareholders. The reservoir has an excellent storage <br />decree dating from 1910. The decree allows a stQrage volume of 837.99 <br />acre feet. The original dam was constructed around 1910. An <br />enlargement was approved for construction by the State Engineer April <br />25, 1949, and the existing structure was built 1949-1950. Currently the <br />reservoir is under restriction due to a slump on the downstream face to <br />the left of the outlet The 5 foot restriction results in the loss of <br />approximately 250 acre feet of storage. G.D.R.C. wishes to make the <br />repairs necessary to bring the reservoir to full capacity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.