My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150266 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150266 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 9:51:36 AM
Creation date
7/7/2008 11:14:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150266
Contractor Name
Granby Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />6. Will the acquisition of additional water rights be necessary? YES NO X <br />If YES, please explain <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />BuckhomGeotech 222 So Park Ave. Montrose, CO 81401 Ph 970-249-6828 <br />Clay&Dodson,P.C. P.O. Box 38, Delta, CO 81416 Ph 970- 874-9777 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br />Preliminary Report enclosed. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs:$ 64,100.00 <br />Estimated Construction Costs: $2.1 E; S 10. 00 ~~ <br />Estimated Total Costs: $. :L 7 9) ~ If) .of) ~l:- <br />$ ,b2 ~~.1 ()() D <br /> <br />-"- <br />" <br /> <br />1 O. Loan amount and terms you are requesting. <br /> <br /> <br />Requested Loan Amount: <br />Term (length) ofloan: <br />Interest Rate: <br /> <br /> <br />. ~ D (Usually 75% ofEsti.mated Total Costs) <br />30 years (Usually 10,20, or 30 years) <br />2.25% (please call for our CWTent rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following infonnation is <br />needed to assist the CWCB in a preliminary assessment of the appliamt's financial capacity. It is also <br />requested that the project sponsor submit with this application copies of the two most recent annual <br /> <br />3 <br /> <br />CFLA602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.