My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150266 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150266 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 9:51:36 AM
Creation date
7/7/2008 11:14:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150266
Contractor Name
Granby Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and descnbe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. Granby Ditch & Reservoir Company is composed of 6 reservoirs on the Grand Mesa. <br />Because of the unique distribution system is able to serve the entire Swface Creek and Tongue <br />Creek drainage areas. <br />For existing facilities indicate: <br />Number of shareholders 81 or Number of customers served 81 <br /> <br />Current Assessment per share $18.00 <br />Number of acres inigated 2384 <br /> <br />Number of shares: 700 <br /> <br />Part B. - Description of the Project <br />1. Name of the project or fucility Granby Reservoir # 11,... <br /> <br />2. Purpose of this loan application. Cheek one. <br />New project <br />X Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (descnbe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES X NO_ <br /> <br />4. General location of the project. (please include county, and approximat~ distance and direction <br />from nearest town, as well as legal description, if known. North from Cedaredge on Hwy 65 <br />approximately 15 miles to Island Lake Camp Ground. Turn left thru camp ground on FS Road <br />4WD #115 approximately 4 miles. (See 20-TS12S Range 95WS) <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />Reservoir has been under restriction since early 1970 resulting in a loss of250 acre feet of water. <br />Reservoir owners are planning to rehabilitate reservoir. Enclosed is copy of "Feasibility Report <br />and Preliminary Budget to Repair Dam" Report was done by BuckhomGeoteeh and is the basis for <br />this loan application. <br /> <br />2 <br /> <br />CFLA602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.