My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Monitor Ditch Diversion
CWCB
>
Watershed Protection
>
DayForward
>
Monitor Ditch Diversion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 9:59:55 PM
Creation date
6/19/2008 1:50:35 PM
Metadata
Fields
Template:
Watershed Protection
Document ID
hr_0005
County
Delta
Community
Hotchkiss - Paonia
Stream Name
North Fork Gunnison River
Basin
Gunnison
Sub-Basin
North Fork Gunnison 14020004
Water Division
4
Title
Monitor Ditch Diversion Project
Date
3/24/2004
Prepared For
CWCB
Prepared By
North Fork River Improvement Asssociation (NFRIA)
Watershed Pro - Doc Type
Project Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 i <br />~-... <br />;~ ~. <br />- - <br />- ~~. <br />TASK 4: Bunk Sluhi/izution crncl revegetaliott <br />Tirrning the water inty the main <br />channel. The white ruler upstream <br />vjthe headwall is rate r earning <br />vver the rlivi•rrion weir. making frsh <br />and boat passage safe. <br />Products: Rock structures that hold banks in place, <br />even during high water. Also, nine old car bodies <br />were removed from the site, which makes boat <br />passage safe. Rcvegctation will take place in October <br />of 2004 following a season of naturally recruited <br />riparian growth. <br />Cost to date: X4500 <br />Completed: 3/22/04 <br />"TASK S: Project Coorclituttiat ce Gru-tt Adminislrctliott <br />Products: NFRIA staff were able to supervise construction of the headgatc and <br />diversion, overseeing implementation of engineering plans and specs. In addition, <br />matching funds were solicited and secured, invoices collected, and reports were <br />produced. <br />Cost to date: 5?032.92 <br />Completed: 3/23/04 <br />TASK 6: Mottitorittg <br />Products: NI~RIA staff will continue to monitor established cross sections through <br />river survey. "['his will be carried out indefinitely. <br />Cost to date: $0 <br />Completed: On-going <br />N:valuation of Coal :achievement <br />"Chc project has initially been judged a great success by the Monitor Ditch Company. <br />Improvements are functioning as intended to reduce streambank erosion, conserve water, <br />reduce non-point pollution, and enhance habitat. "I'he project was completed within <br />budget thanks in part to the many in-kind donations made by landowners, contractors, <br />and community members. <br />Reconstruction was planned to be carried out during the winter low water. Though <br />weather is warming up early, causing water levels to rise, construction crews were able to <br />erect the hcadgate and diversion structures in time. [t is a dramatic improvement from <br />the previous diversion structure and landowners have taken notice. Duc to the warming <br />trend, though, NFRIA will need to complete grouting on the headwall, as well as the <br />
The URL can be used to link to this page
Your browser does not support the video tag.