Laserfiche WebLink
Volunteer hand crews and RMYC were also used to restore an additional '/4 acre of <br />degraded forest land. Treatment prescriptions included the use of land recontouring, <br />3,780 sq/ft of erosion control matting, soil amendment, and seeding. <br />-: <br />Fig~~re 13 arzd 1-1. Before ajzd after~horogra~hs of restored degraded area. <br />The breakdown of hours used in completing this part of the project is as follows: <br />• Volunteer hand crews contributed 185 person hours to lay erosion control <br />matting, seed, and Bio-sol to restore and stabilize chaiulel banks. <br />• A Roclcy Mountain Youth Corps team worked 360 person hours in completing <br />rock retaining walls, recontouri~lg, and armoring channel baiilcs. <br />• In total, 545 person hours over 7.5 days were used to prepare and complete <br />stabilization of the 1075' of gully channel and restore impacted areas. <br />10 <br />Figure 10 atld 11. Erarn~les ofg~rlly baril~ stabilization zisitzg ~~~oody material mzd retaiyziy~g ~~~alls. <br />