Laserfiche WebLink
the CWCB grant fiends, was $29,400. Funding sources and Costs by Objective and Taslc are <br />displayed in the following table. <br />Midway Streambank Stabilization Project Costs <br />ra~~ ~. runuu~u wu~~Ca <br />CWPF Funds ~ $15,000 <br />Local Cash Match ~ $3,750 <br />1) Project engineering, surveying & management <br />(in-kind) $300 <br />2) Local boulder donations <br />(170 tons x $50/ton) (in-kind) $10,050 <br />3) North Fork River Improvement Association <br />(Office Administration)(in-kind) $300 <br />TOTAL COSTS <br />$29,400 <br />Part 2: Costs by Objective and Task Cash In-Kind CWPF <br />TOTAL Match Match Funds <br />Personnel/Support <br />Project engineering, surveying & management $1,800 $0 $300 $1,500 <br />Subtotal $1,800 $0 $300 $1,500 <br />Objective 1: Mobilization/Demobilization <br />Equipment Transport $800 $0 $0 $800 <br />Best Management Practices $750 $0 $0 $750 <br />Subtotal $1,550 $0 $0 $1,550 <br />Objective 2: Streambank Stabilization <br />Boulders delivered to site <br />(170tons x $75/ton) <br />Stabilization structures installed <br />$14,300 $0 $10,050 $4,250 <br />$10,750 $3,750 $7,000 <br />Subtotal $25,050 $3,750 $10,050 $11,250 <br />Objective 3: Monitoring <br />Field survey ex cross sections & photo points $300 $0 $0 $300 <br />Plot and analyze $200 $0 $0 $200 <br />Subtotal $500 $0 $0 $500 <br />Administration <br />Office administrator $500 $0 $300 $200 <br />Subtotal $500 $0 $300 $200 <br />TOTAL COSTS $29,400 $3,750 $10,650 $15,000 <br />