Laserfiche WebLink
Various direct flow rights have been claimed for Central's use for storage, recharge, <br />augmentation, and other uses. Table 6 should be completed when the final decree information is <br />entered into HydroBase. <br />Table 6 <br />Central WAS Au mentation Plan S stem Chan ed Direct Flow Water Ri hts <br /> <br />Ditch Name <br />Approp. <br />Adjud. <br />Admin <br />No Decreed Rate <br />(cfs) <br />~~° <br /> D D . <br />. hi <br />O <br /> ate ate wners <br />p <br /> Total Central <br />Pending Decree <br />Augmentation Plan Operations <br />Operating rules to replace river depletions from well pumping include the following in order of <br />use: <br />1. Well depletions (stored under plan IDs 9903394 A, 9903394 B, 9903394_C, 9903394_D, <br />9903394_E, and 9903394 F) should be replaced year-round by natural flows when in <br />priority, i.e., when no downstream call or when downstream call is junior to specific well <br />priority dates used in administration of the plan. <br />2. Well depletions (stored under plan IDs 9903394_A, 9903394_B, 9903394_C, 9903394_D, <br />9903394_E, and 9903394 F) should be replaced year-round with available recharge <br />accretions from canal seepage and recharge seepage as follows (listed in generally upstream <br />to downstream order): <br />• 9903394_P1CF accretions and 9903394_P1RF accretions replace 9903394 F depletions <br />• 9903394_P1CC accretions and 9903394_P1RC accretions replace 9903394_C depletions <br />• 9903394_P1CB accretions and 9903394_P1RB accretions replace 9903394_B depletions <br />• 9903394_P1CA accretions and 9903394_P1RA accretions replace 9903394_A depletions <br />• 9903394_P1CD accretions and 9903394_P1RD accretions replace 9903394_D depletions <br />• 9903394_P1CE accretions and 9903394_P1RE accretions replace 9903394_E depletions <br />• 9903394_P1CF accretions and 9903394_P1RF accretions replace 9903394_C depletions <br />• 9903394_P1CF accretions and 9903394_P1RF accretions replace 9903394_B depletions <br />• 9903394_P1CF accretions and 9903394_P1RF accretions replace 9903394_A depletions <br />• 9903394_P1CC accretions and 9903394_P1RC accretions replace 9903394_B depletions <br />• 9903394_P1CC accretions and 9903394_P1RC accretions replace 9903394_A depletions <br />• 9903394_P1CB accretions and 9903394_P1RB accretions replace 9903394_A depletions <br />• 9903394_P1CD accretions and 9903394_P1RD accretions replace 9903394_B depletions <br />• 9903394_P1CD accretions and 9903394_P1RD accretions replace 9903394_A depletions <br />• 9903394_P1CE accretions and 9903394_P1RE accretions replace 9903394_B depletions <br />• 9903394_P1CE accretions and 9903394_P1RE accretions replace 9903394_A depletions <br />Remaining summer well depletions on the South Platte below Kersey (stored under plan IDs <br />9903394 A and 9903394_B) should be replaced with a bypass of a portion of the direct flow <br />water rights changed in the Central WAS augmentation plan (see Table 6 for list of changed <br />water rights associated with WAS plan ID). Operations of bypasses require maintenance of <br />historical return flows, which should be added to the well depletion plan structure (ID <br />9903394_A). <br />A-16 ofA-106 <br />