Laserfiche WebLink
release directly to river. <br />Direct Right Bypass Various Diversion IDs used to replace depletions by direct bypass <br />of ortion of direct flow ri ht. <br />Lagged accretions to the South Platte River from recharge diversions are returned to the river <br />based on return flow factors and locations defined in StateMod input files. Lagged accretions <br />should be accounted in recharge accretions structures based on source of seepage water - <br />recharge site seepage (IDs 9903394_P1RA, 9903394_P1RB, 9903394_P1RC, 9903394_P1RD, <br />9903394_P1RE, and 9903394_P1RF) or canal seepage (IDs 9903394 P1CA, 9903394 P1CB, <br />9903394_P1CC, 9903394_P1CD, 9903394_P1CE, and 9903394_P1CF) as summarized in Table 2. <br />Canal seepage should be accounted based on simulated ditch losses from all diversions to <br />recharge when no other supplies (e.g., irrigation) are being run in the ditch. Canal seepage and <br />recharge seepage associated with the Central WAS plan should be assigned to the various <br />administration reaches based on spatial location. <br />Numerous recharge water rights are claimed under the ditch systems that are part of the proposed <br />plan. The demand for the recharge water rights associated with the Central WAS plan should be <br />modeled based on the pending decree. Table 3 should be completed when the final decree <br />information is entered into HydroBase. <br />Table 3 <br />Central WAS Augmentation Plan Recharge Water Rights <br />Dit <br />h Recharge Site at end of Capacity / Supply <br />c Ditch Target Amount Admin. No. A .Date <br />Pending Decree <br />Numerous recharge wells and augmentation wells and pumps are claimed as part of the proposed <br />plan. Table 4 should be completed when the final decree information is entered in to HydroBase. <br />Table 4 <br />Central WAS Augmentation Plan Augmentation Well/ <br />Rechar a Well Water Ri hts <br />ll ID <br />W U Supply <br />e se Amount Admin. No. App. Date <br />Pending Au mentation P <br />di <br />D <br /> <br />Decree <br />Rechar e en <br />ng <br />ecree <br />Various storage rights in the proposed plan may already be decreed. Table 5 should be <br />completed when the final decree information is entered into HydroBase. <br />Table 5 <br />Central WAS Augmentation Plan System Storage Water Rights <br />R <br />i Filler Ditch Capacity / Su 1 <br />eservo <br />r (if applicable) Target Amount Admin. No. App. Date <br />Pending Decree <br />A-15 ofA-106 <br />