My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 5 <br />Augmentation Plan Structures <br />Component Recommended WDID Comment <br /> Plan WDID with _1, _2, ... <br /> suffixes, as necessary, to <br />Augmentation represent multiple Plan IDs used to track augmentation plan operations <br />Plan administrative locations within including total pumping, depletions, and water <br /> the same Water District supplies. <br /> e.g., 0103339, <br /> 6402539_1 and 6402539_2 <br /> Carrier Ditch WDID Rch, <br />Recharge Site if specific Structure WDID for Recharge "Reservoir" IDs used to store diversions <br /> Recharge Site does not exist to Recharge sites. <br /> e.g., 0100507 Rch, 0102061 <br /> Plan WDID P1R with 1, 2, <br />Recharge ~ ~ . suffixes, as necessary, to <br />represent multiple locations plan IDs used to track lagged accretions from <br />See a e <br />p g <br />within the same Water District Rechar e sites see a e i.e. Plan Rechar e - P1R . <br />g p g ~ ' - - g ~ <br /> e. ., 0103339 P1R <br /> Plan WDID P1C with 1, 2, <br /> <br />Canal Seepage ... suffixes, as necessary, to <br />represent multiple locations plan IDs used to track lagged accretions from Canal <br /> within the same Water District seepage (i.e., Plan Canal recharge - P1C). <br /> e.g., 0103339 P1C <br />Recharge Well Well WDIDs Well IDs used to for ground water diversion directly <br /> e.g., 6405031 to recharge sites. <br />Augmentation Well WDIDs Well IDs used to track accretions from a ground <br />Well e.g., 6405027 water diversion directly to river. <br />Reservoir Structure WDIDs Reservoir IDs used to replace depletions by a <br /> e. ., 0103570 stora e release directl to river. <br />Direct Right Ditch WDIDs Diversion IDs used to replace depletions by direct <br />Bypass e.g., 0100507 bypass of portion of direct flow right. <br />Well Pumping and River Depletions <br />Since historical well pumping is not generally available, historical well pumping should be <br />estimated by the consumptive use model, StateCU, to meet the irrigation water requirement less <br />surface water deliveries (if applicable). This method will limit pumping to the dates when ground <br />water rights were appropriated and the acres served by ground water. Lagged depletions from <br />simulated well pumping, including decreed alternate point wells, should be accounted in river <br />flows based on the location of the wells and estimates of the spatial and temporal distributions of <br />lagged depletions from the wells developed in the SPDSS MODFLOW model or similar lagging <br />methodology. <br />• Lagged river depletions from wells, if any, that require augmentation should be accounted in <br />StateMod well depletion Plan structures assigned to an augmentation plan. Augmentation <br />plan accounting for aggregate lagged river depletions are typically administered on a monthly <br />basis below the main ditch headgate (for ditch plans) and/or above major calling rights (for <br />non-ditch plans). <br />12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.