My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task7-2_WellUseWellAugmentationPlans
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task7-2_WellUseWellAugmentationPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:38:15 AM
Creation date
6/11/2008 2:31:12 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 7.2 - Well Use and Well Augmentation Plans
Description
This memorandum and associated appendices characterizes the 20 largest well augmentation plans and develops recommendations for representing well use and augmentation in SPDSS modeling efforts.
Decision Support - Doc Type
Task Memorandum
Date
12/14/2007
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Modeling Recommendations and Plan Operations <br />The following should be used as a guide in the initial development of the SPDSS StateMod <br />Water Resources Planning Model to represent well operations and well augmentation plans in <br />the South Platte River alluvium for the 25 major plans. Well depletions on irrigated parcels <br />associated with the relatively small well augmentation plans, or not associated with <br />augmentation plans in HydroBase, should be represented but it is recommended that <br />augmentation of the well depletions not be explicitly represented in the SPDSS Surface Water <br />Planning Model. <br />Designated Basin Wells <br />Designated ground water is defined as ground water not naturally available for fulfillment of <br />decreed surface water rights or ground water in areas not adjacent to a continuously flowing <br />natural stream. Designated ground water basins are generally considered to not affect surface <br />rights in the South Platte River basin and should not be represented in the SPDSS Surface Water <br />Planning Model. <br />Coffin Wells <br />The Coffin wells were decreed non-tributary in Civil Action 11217 and, therefore, do not require <br />augmentation. Since the wells are considered not tributary to the South Platte River system, <br />augmentation of the Coffin wells should not be represented in the SPDSS Surface Water <br />Planning Model. <br />Decreed alternate point wells <br />Wells decreed as alternate points should be simulated to pump up to the amount of the associated <br />decreed surface water right that is available in priority limited by the well capacities and limited <br />by the demand on the associated well acreage. Wells associated with the Poudre Plan should be <br />represented as Decreed alternate point wells, with total well pumping from the Plan wells limited <br />by the total amount of decreed surface water rights available in priority at the river headgates <br />associated with the Poudre Plan (see Appendix A-2). <br />Augmentation Plan Representation for Wells Requiring Augmentation <br />Well use and well augmentation plans in the SPDSS Water Resources Planning Model should <br />include representation of well pumping and associated depletions, replacement water supplies, <br />and operating rules to represent the replacement of lagged well depletions. Table 5 includes <br />general nomenclature recommended for StateMod model nodes used to represent augmentation <br />plan demands and supplies. Not all elements are required for representation of each <br />augmentation plan. <br />11 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.