My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task39_Phase4_FinalWaterLevelMeasurement
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task39_Phase4_FinalWaterLevelMeasurement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:19:01 AM
Creation date
6/10/2008 11:59:47 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 39 - Final Water Measurement - Phase 4
Description
This technical memorandum documents the methods and results of Task 39, and focuses on field data collection with limited analysis provided.
Decision Support - Doc Type
Task Memorandum
Date
5/20/2008
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.0 Wells with Continuous Data Loggers <br />As part of Task 39, groundwater level data were retrieved from the data loggers u142 SPDSS <br />monitoring wells. There are 37 wells in the alluvial aquifer, one well u1 the Dawson Aquifer, one <br />in t11e Denver Aquifer, two in the Arapahoe Aquifer, and one uz the Laramie-Fox Hills Aquifer. <br />A list of all wells wit11 continuous data loggers is provided in Table 3, and locations are shown <br />u1 Figure 3. Eight of the 42 SPDSS monitoring wells are owned by other cooperating entities, <br />including t11e United States Geological Survey, the City of Sterling, Town of Castle Rock and <br />other private owners. Tl1e remaining 34 SPDSS monitoring wells were drilled and installed by <br />the SPDSS under Task 35. The data loggers were installed in the monitoring wells during <br />previous phases and have been continually collecting water level measurements on an hourly <br />interval. The Phase 4 data were retrieved in the spring of 2007 and cover the period from spring <br />2006 to sprung 2007. <br />Table 3 -Wells with Continuous Data Loggers <br />Well A uifer Nearb Landmark Fi ure <br />DSS02MLK Alluvial Miliken E-1 <br />DSS03OCH Alluvial Orchard E-2 <br />DSS04WIG Alluvial Wi ens E-3 <br />DSS05WLD Alluvial Weldona E-4 <br />DSS06WLD Alluvial Weldona E-5 <br />DSS07BLZ Alluvial Balzac E-6 <br />DSS08BLZ Alluvial Balzac E-7 <br />DSS09STR Alluvial Sterling E-8 <br />DSS10STR Alluvial Sterling E-9 <br />DSS111LF Alluvial Iliff E-10 <br />DSS12JBG Alluvial Julesburg E-11 <br />DSS13JBG Alluvial Julesburg E-12 <br />DSS14DIA Alluvial Denver Int'I Airport E-13 <br />DSS15DIA Alluvial Denver Int'I Airport E-14 <br />DSS16HND Alluvial Henderson E-15 <br />DSS17HND Alluvial Henderson E-16 <br />DSS18HND Alluvial Henderson E-17 <br />DSS19BBD Alluvial Beebee Draw E-18 <br />DSS20BBD Alluvial Beebee Draw E-19 <br />DSS21 BBD Alluvial Beebee Draw E-20 <br />DSS22KRY Alluvial Kersey E-21 <br />DSS23KRY Alluvial Kersey E-22 <br />DSS24KRY Alluvial Kersey E-23 <br />DSS25KRY Alluvial Kersey E-24 <br />DSS26KRY Alluvial Kersey E-25 <br />DSS27KRY Alluvial Kersey E-26 <br />DSS28KRY Alluvial Kersey E-27 <br />DSS29BXE Alluvial Box Elder Creek E-28 <br />DSS30BXE Alluvial Box Elder Creek E-29 <br />DSS31 WLD Alluvial Weldona E-30 <br />DSS32WLD Alluvial Weldona E-31 <br />SPDSS Phase 4 Task 39 Technical Memorandum-Final 10 <br />O~i20%2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.