My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:15:41 AM
Creation date
6/9/2008 12:58:31 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 Phase 2 Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring
Description
This document presents the Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring. This document includes the memo and figures. Appendices are included in a separate document.
Decision Support - Doc Type
Task Memorandum
Date
8/13/2004
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Platte Decision Support System <br />Groundwater Component <br />Phase 2 Task 33.2 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, <br />Testing, and Water Level Monitoring <br />1.0 Introduction and Objectives <br />This document supersedes the previously submitted Phase 1 Task 33 Field Study <br />Work Plan for Alluvial and Bedrock Well Installation (CDM 2003a) (Phase 1 Work <br />Plan) and summarizes the Phase 2 results of Task 33 of the South Platte Decision <br />Support System (SPDSS), Field Study Workplan Development. The objective of the <br />Phase 2 Field Program is to fill data gaps identified under Tasks 31/42, 32/43, and <br />38/44 as described in the Scope of Work (SOW) submitted to the Colorado Water <br />Conservation Board (CWCB) on October 30, 2003 (CDM 2003b). All geologic drilling <br />and testing will be performed in accordance with State of Colorado (State) statutes <br />and rules (SEO 2000); if any discrepancies occur between the methods described <br />herein and State laws, the State requirements will prevail. <br />For the purposes of the SPDSS, the groundwater study area is divided into two <br />hydrologic regions based on the extent of the Denver Basin bedrock aquifers <br />(Figure 1). The Denver Basin Region includes the bedrock aquifers of the Denver <br />Basin and its overlying alluvium, extending downstream on the South Platte River <br />from approximately Chatfield Reservoir to the streamflow gage at Weldona. The <br />Denver Basin Region also includes Designated Basins overlying the Denver Basin and <br />several drainages that are tributary to the Arkansas River. The Lower South Platte <br />Alluvium Region includes the main stem of the South Platte River valley and <br />tributary mouths between Weldona and the Nebraska State Line. <br />By necessity, many specific elements of the field program depend on results of <br />ongoing analysis and availability of site access. For this reason, specific locations for <br />new wells are not identified, but rather the general locations where additional data <br />are required are provided in this work plan. As specific locations are finalized, these <br />will be provided to the State. <br />The Phase 2 field program will commence after the State provides written approval of <br />this Field Study Work Plan. The field program is anticipated to begin during the <br />summer of 2004. The basic elements of the field program are provided below. <br />1.1 Work Plan Organization <br />This work plan is organized into the following sections: <br />^ Section 1 presents an introduction and overview of the SPDSS Phase 2 Field <br />Program goals <br />`~ ~ <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.