My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:15:41 AM
Creation date
6/9/2008 12:58:31 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 Phase 2 Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring
Description
This document presents the Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring. This document includes the memo and figures. Appendices are included in a separate document.
Decision Support - Doc Type
Task Memorandum
Date
8/13/2004
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Platte Decision Support System Groundwater Component Task 33 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring <br />Aquifer testing of municipal wells will be performed for a period of between 8 and <br />72 hours. If feasible, recovery data will be measured and recorded for the same <br />duration as the pumping phase. All procedures for discharge, water level <br />measurement, and aquifer test analysis will be the same as those discussed in <br />Section 3.1.4. <br />2.5 Task 38, Proposed Water Level Monitoring Locations <br />The SEO water level measurement databases for the Denver Basin and Lower South <br />Platte Alluvium Regions will be reviewed to identify candidate wells for autumn post <br />irrigation-season water level measurement in both the bedrock and alluvial aquifers. <br />Criteria for evaluating candidate wells include: <br />^ The well location <br />^ Aquifer screened by the well <br />^ Existence of adequate well control (location and measuring-point elevation) data <br />^ Historic record of measurements <br />^ Whether measurements are currently collected in the autumn by SEO staff or other <br />cooperating entities <br />The selected subset of wells to be measured will be chosen to represent areas most <br />impacted by groundwater development and to yield good spatial distribution. <br />Candidate wells will be discussed with SEO staff knowledgeable with the existing <br />water level monitoring program during a single half-day meeting. Issues such as site <br />access, measurement procedures, and prior experience at the candidate locations will <br />be discussed. Alternate sites may be selected based on this meeting. It is anticipated <br />that at least 60 wells will be measured once during this Task, with the specific number <br />of wells and their location in the Denver Basin and Lower South Platte Alluvium <br />Regions defined after CDM evaluates the existing data gaps and meets with SEO staff. <br />Sites for continuous monitoring of bedrock aquifer water levels will be evaluated as <br />part of this process. <br />Sites selected for monitoring will be finalized and the listing sent to the State for <br />approval. Copies of field notes from the sites will be provided by SEO staff to the <br />Consultant. It is anticipated that CDM will not need to contact any of the well owners, <br />that access to the wells will be straightforward, and that separate site visits will not be <br />needed prior to collecting the water level field data. Water levels will be measured <br />according to the procedures described in Appendix H. <br />~.~.-~ <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.