My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:16:30 AM
Creation date
6/9/2008 11:25:35 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 - Phase 3 Field Study Work Plan for Streambed Conductance Testing and Water Level Measurment
Description
This document presents the Field Study Work Plan design, Task 33.2 of Phase 3 of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Task Memorandum
Date
8/3/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4 <br />Documentation of Field Activities <br />All manual field measurements will be tabulated in a field notebook according to the <br />procedures provided in Appendix A and subsequently entered into an existing <br />electronic database by CDM. Following data quality control and checking (QC), field <br />data necessary for evaluations will be provided to the State in a form suitable for <br />addition to HydroBase. Electronic data downloads from automated data collection <br />equipment will be saved to disk, reduced, and provided to the State in a form suitable <br />for addition to HydroBase. Geotechnical data will be obtained from the laboratory in <br />electronic format to facilitate hydraulic conductivity analysis. <br />Field and testing data will be collected in a manner consistent with the planned data <br />analyses, mapping and reporting in the TMs to be prepared under Tasks 34.3, 39.2, <br />and 39.3, as described in the Phase 3 SOW (CDM 2005). The water level data will be <br />analyzed as part of Task 44, and the electronic data will be put into aHydroBase- <br />compatible format consistent with previous groundwater level data. <br />~~ <br />4-1 <br />FINAL SPDSS T33 WORK PLAN &3-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.